Black Box RM571 Manual Download Page 7

MAX SECURE CO-LOCATION CABINET AND ACCESSORIES

4

Cabinet Top Panel with Fan

(RM972 and RM977)

Description

This fan will provide adequate cooling in your Cabinet. The Panel mounts on top of the Cabinet. The fan
measures 10 inches (25.4 cm) and features 535-CFM cooling and finger guards.

What’s Included

(1) Top Panel with Fan

(4) #10-32 screws

(4) #10-32 clip-nuts

Installation

1. Open the front and rear doors.

2. Remove the screws from the inside of the cabinet that hold the perforated cabinet top in place.

3. Lift the perforated top away from the cabinet.

4. Place the fan/panel top over the cabinet frame.

5. Align the holes in the fan/panel with the cagenuts.

6. Insert the screws into the cagenuts and tighten them.

Summary of Contents for RM571

Page 1: ...1000 Park Drive Lawrence PA 15055 1018 724 746 5500 Fax 724 746 0746 Copyright 2000 Black Box Corporation All rights reserved...

Page 2: ...l 724 746 5500 or fax 724 746 0746 Mailing address Black Box Corporation 1000 Park Drive Lawrence PA 15055 1018 Web site www blackbox com E mail info blackbox com CUSTOMER SUPPORT INFORMATION AUGUST 2...

Page 3: ......

Page 4: ...ered trademark of Dell Corporation HP is a registered trademark of Hewlett Packard IBM is a registered trademark of International Business Machines Corporation Any other trademarks mentioned in this m...

Page 5: ...e Co Location Cabinet RM970A and RM975A Specifications Frame 14 gauge steel Rack Spaces 45 U Mounting Rails 16 gauge steel Size Exterior 87 25 H x 22 16 W x 36 D 221 6 x 56 3 x 91 4 cm Interior 77 H x...

Page 6: ...Locks on front and rear doors secure your server The top and bottom compartments are keyed differently Installation The Max Secure Co Location Cabinet holds servers from Compaq Dell IBM HP and most o...

Page 7: ...5 CFM cooling and finger guards What s Included 1 Top Panel with Fan 4 10 32 screws 4 10 32 clip nuts Installation 1 Open the front and rear doors 2 Remove the screws from the inside of the cabinet th...

Page 8: ...t Vents ensure proper front to back airflow The shelf supports 125 pounds 56 7 kg of equipment and is 19 inches 48 3 cm wide What s Included 1 19 W x 28 D Vented Shelf 4 10 32 clip nuts 4 10 32 x 1 2...

Page 9: ...a clip nut from a rail insert a flat blade screwdriver or knife under the tab on the front and pry up freeing the retaining ring from the rail See the illustration above 1 Select the location where th...

Page 10: ...t and is 19 inches 48 3 cm wide What s Included 1 Vented Sliding Shelf 10 10 32 clip nuts 8 10 32 x 1 2 screws 2 10 32 screws 2 8 32 x 3 8 screws 2 8 32 nuts Additional Tools Required Phillips head sc...

Page 11: ...X SECURE CO LOCATION CABINET AND ACCESSORIES 8 Cable retractor 10 32 screw Rivet Slide 10 32 x 1 2 screw 8 32 nut Clip nut Right hand Bracket Left hand Bracket Bottom View 8 32 screw Pancake screw Lat...

Page 12: ...a clip nut from a rail insert a flat blade screwdriver or knife under the tab on the front and pry up freeing the retaining ring from the rail See the illustration above 1 Select the location where th...

Page 13: ...rews 4 10 32 clip nuts Additional Tools Required Phillips head screwdriver Installation Clip nuts provide mounting points on 19 rackmount equipment rails Clip nuts have a front or side screw Consider...

Page 14: ...ut into the top hole at the selected position and then install another one four holes down See the figure below 3 Measure from the bottom of the vertical rail to the top clip nut Assemble clip nuts on...

Page 15: ...3B 10 Phillips head screws Additional Tools Required Phillips head screwdriver Installation 1 Before installing the Keyboard Shelf adjust the mounting rails to the proper depth 2 Determine the desired...

Page 16: ...MAX SECURE CO LOCATION CABINET AND ACCESSORIES 13 Mounting bracket Clip nut Plastic Bushing Kep nut Slide 10 32 screw 8 32 screw Keyboard tray Keyboard area Cable retractor Rivet...

Reviews: