23
22
20
21
20 POP-UP ROD LINKAGE & ADJUSTMENT
Place one end of Spring Clip (
20C
) on end of Ball Rod (
20B
). Insert Ball Rod
(
20B
) across and through hole in Pop-Up Strap (
20D
). Secure other end of
Spring Clip (
20C
). Insert bottom of Lift Rod (
20A
) into hole at top of Pop-Up
Strap (
20D
). Tighten with Thumb Screw (
20E
).
20E
20E
Adjust Lift Rod (
20A
) height by
using the Thumb Screw (
20E
) on the Strap (
20E
20E
20D
) or by adjusting the hole in
which Ball Rod (
20B
) goes through the Pop-Up Strap (
20D
). Be sure to leave
enough space between Lift Rod Knob (
20F
) and Spout Head (
20F
20F
20G
) when Lift
Rod is down.
21 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below
the sink.
22 FLUSHING & AERATOR CLEANING
After installation is complete, remove Aerator Housing (
22A
). Turn Valves
(
22B
) on and allow both hot and cold water to run for at least one minute each.
While water is running, check for leaks. To clean the aerator, disassemble Aerator
Housing (
22A
) by separating the Aerator Shell (
22C
), Basket (
22D
), and Washer
(
22E
). Once parts have been cleaned, reassemble by reversing steps.
22E
22E
23 VALVE CARTRIDGE MAINTENANCE
Turn off water supplies and relieve pressure before working on your faucet (see
step 2). Remove Handles (see step 15), Valve Flange (
23B
) and Plastic Nut
(
23C
) (see step 13), unscrew Cartridge Assembly (
23A
) and inspect. Replace
parts as necessary.
MAINTENANCE & CARE
6
ENGLISH
23C
22A
22A
20F
20G
20A
20A
20E
20C
20D
20B
20A
20A
20E
20D
20B
20C
22B
22E
22D
22C
23B
23A
23A