Gas Pressure Fryer
Operation
23
Start-Up (LGF-FC)
1. Make sure the main drain valve is closed.
2. Fill pot with shortening to about one inch below the mark.
Risk of fire exists if the oil level drops below the minimum oil level. The level of oil
within the pot must not fall below 5mm of the maximum oil level.
Use of oil/shortening older than the manufacturers recommendations for life of
the oil is prone to surge boiling and flash fires. Follow the oil manufacturers
guidelines for lifecycle of oil/shortening.
Overfilling the fryer pot with shortening could lead to serious injury. Ensure that
the fryer pot is filled with shortening only to the fill mark when shortening is hot.
Do not use any shortening other than what is specified in this manual and do not
overfill the fryer pot.
The LGF-FC fryer has a maximum temperature setting of 390º F (200º C). Do not
use oil/shortening with a flashpoint less than 554º F (290º C)
Use only high-quality shortening that has low moisture content, a high smoke
point and no additives.
3. Place the gas control
ON/OFF
switch in the
ON
position.
4. Place
the
FILTER/OFF/FRY
switch to the
FRY
position. The question “Is the Fry Pot filled – If yes press
ENTER” will appear on the computer display. The shortening will heat and begin to reach the fill mark
inside the pot.
5. Add more shortening as required to reach the fill mark. Once the oil reaches the fill mark, press the
ENTER
button. The computer will display “STIR OIL” and
automatically enter the STIR OIL mode. In this
mode the computer will heat the oil to 255
°
F and hold that temperature.
6. Stir the oil freely while it is heating. Press the
0
button when finished stirring the oil.
IMPORTANT
!
Before the first cooking operation each day, stir the shortening freely while it is heating to
provide a balanced shortening temperature for excellent results with the first cooking. Failure to do this
can result in a crusty skin on the product surface with an undercooked product internally. In addition, in
some cases, failure to stir the shortening while it is initially heating may cause the HI-LIMIT safety device
to disable the power due to a false overtemperature condition.
Cooking (LGF-FC)
1. Ensure that the Start-Up procedures have been performed.
2. Press the desired program number on the keypad. The computer will still display "
LOW
". The fryer will
begin to heat to the temperature that has been factory preset. When "
READY
" appears on the display,
the fryer is up to the desired temperature and the product can be loaded.
3. When frying chicken, connect the basket handle and lower the basket into the shortening in the fryer pot.
Hot shortening may splash out of the pot causing severe injury when dropping chicken
into pot. Carefully drop pieces of chicken into pot to prevent shortening splashes.
Summary of Contents for LGF
Page 1: ...Gas Pressure Fryer MODELS LGF LGF F LGF FC Service Manual Serial Numbers 137733 and higher ...
Page 11: ...Gas Pressure Fryer Introduction 9 Safety Labels ...
Page 12: ...Gas Pressure Fryer Introduction 10 ...
Page 32: ...Gas Pressure Fryer Replacement Parts 30 Figure 3 Lid Arm Assembly AN3211350S Sheet 1 of 4 ...
Page 33: ...Gas Pressure Fryer Replacement Parts 31 Figure 3 Lid Arm Assembly AN3211350S Sheet 2 of 4 ...
Page 34: ...Gas Pressure Fryer Replacement Parts 32 Figure 3 Lid Arm Assembly AN3211350S Sheet 3 of 4 ...
Page 35: ...Gas Pressure Fryer Replacement Parts 33 Figure 3 Lid Arm Assembly AN3211350S Sheet 4 of 4 ...
Page 38: ...Gas Pressure Fryer Replacement Parts 36 Figure 5 Drain Motor Piping Assembly ...
Page 40: ...Gas Pressure Fryer Replacement Parts 38 Figure 6 Burner Tray Assembly ...
Page 42: ...Gas Pressure Fryer Replacement Parts 40 Figure 7 Control Insulation Panel LGF LGF F ...
Page 44: ...Gas Pressure Fryer Replacement Parts 42 Figure 8 Control Insulation Panel LGF FC ...
Page 47: ...Gas Pressure Fryer Replacement Parts 45 Figure 10 Oil Vat Assembly AN32112800 ...
Page 55: ...Gas Pressure Fryer Wiring Diagrams 53 Figure 17 LGF F 120V 60HZ 1 Phase ...
Page 56: ...Gas Pressure Fryer Wiring Diagrams 54 Figure 18 LGF FC 120V 60HZ 1 Phase ...
Page 57: ...Gas Pressure Fryer Wiring Diagrams 55 Figure 19 LGF FC 220V 50HZ 1 Phase ...
Page 58: ...Gas Pressure Fryer Wiring Diagrams 56 Figure 20 LGF FC 220V 60HZ 1 Phase ...
Page 59: ...Gas Pressure Fryer Wiring Diagrams 57 Figure 21 LGF FC 240V 50HZ 1 Phase ...