Gas Pressure Fryer
Operation
15
Care of the Shortening
Solid shortening should always be returned to the filter vat while in the liquid state. If this is not done, it will have
to be heated to a liquid state. When using solid shortening, the fryer must be equipped with a pump heater. After
filtering with solid shortening, the filter lines must be completely emptied of shortening. The pump heater will take
care of any residual shortening in the pump, but cannot melt all of the shortening in the filter lines. The pump
heater accessory may be purchased separately from BKI.
To extend the life of your shortening, for the best possible flavor in your products, and for economy and efficiency
of operation, we urge you to follow these recommendations:
1. Use only high-quality frying shortening without additives, of low moisture content and with a high smoke
point.
2. Press excess moisture from products before breading. The more moisture released in the shortening, the
quicker it will break down.
3. Filter at least once a day or once every three loads during frequent cooking.
4. Clean any residue or crust formations from the sides and bottom of the pot each time you filter the
shortening.
5. Add fresh shortening as needed to maintain the proper shortening level
TO THE FILL MARK ON THE
POT WALL
.
6.
DO NOT HOLD SHORTENING AT HIGH TEMPERATURE
when the fryer is not in use. If you expect an
elapsed time of one hour or more between cooking, close the lid and press the “0” button on the LGF-FC
model. On Models LGF
and LGF-F, set the thermostat to 150º F.
7. Shortening changes are determined by the quantity and type of food prepared. Excessive boiling and
foaming are definite signs of shortening breakdown.
8. After you have finished frying for the day, filter the shortening and replace the filter pad. Also, thoroughly
clean the pot of sediment and crumbs and empty the condensate pan.
LGF and LGF-F Operation
Start-Up (LGF and LGF-F)
1. Make sure the main drain valve is closed.
2. Fill pot with shortening to about one inch below the fill mark.
Risk of fire exists if the oil level drops below the minimum oil level. The level of oil
within the pot must not fall below 5mm of the maximum oil level.
Use of oil/shortening older than the manufacturers recommendations for life of
the oil is prone to surge boiling and flash fires. Follow the oil manufacturers
guidelines for lifecycle of oil/shortening.
Overfilling the fryer pot with shortening could lead to serious injury. Ensure that
the fryer pot is filled with shortening only to the fill mark when shortening is hot.
Do not use any shortening other than what is specified in this manual and do not
overfill the fryer pot.
Summary of Contents for LGF
Page 1: ...Gas Pressure Fryer MODELS LGF LGF F LGF FC Service Manual Serial Numbers 137733 and higher ...
Page 11: ...Gas Pressure Fryer Introduction 9 Safety Labels ...
Page 12: ...Gas Pressure Fryer Introduction 10 ...
Page 32: ...Gas Pressure Fryer Replacement Parts 30 Figure 3 Lid Arm Assembly AN3211350S Sheet 1 of 4 ...
Page 33: ...Gas Pressure Fryer Replacement Parts 31 Figure 3 Lid Arm Assembly AN3211350S Sheet 2 of 4 ...
Page 34: ...Gas Pressure Fryer Replacement Parts 32 Figure 3 Lid Arm Assembly AN3211350S Sheet 3 of 4 ...
Page 35: ...Gas Pressure Fryer Replacement Parts 33 Figure 3 Lid Arm Assembly AN3211350S Sheet 4 of 4 ...
Page 38: ...Gas Pressure Fryer Replacement Parts 36 Figure 5 Drain Motor Piping Assembly ...
Page 40: ...Gas Pressure Fryer Replacement Parts 38 Figure 6 Burner Tray Assembly ...
Page 42: ...Gas Pressure Fryer Replacement Parts 40 Figure 7 Control Insulation Panel LGF LGF F ...
Page 44: ...Gas Pressure Fryer Replacement Parts 42 Figure 8 Control Insulation Panel LGF FC ...
Page 47: ...Gas Pressure Fryer Replacement Parts 45 Figure 10 Oil Vat Assembly AN32112800 ...
Page 55: ...Gas Pressure Fryer Wiring Diagrams 53 Figure 17 LGF F 120V 60HZ 1 Phase ...
Page 56: ...Gas Pressure Fryer Wiring Diagrams 54 Figure 18 LGF FC 120V 60HZ 1 Phase ...
Page 57: ...Gas Pressure Fryer Wiring Diagrams 55 Figure 19 LGF FC 220V 50HZ 1 Phase ...
Page 58: ...Gas Pressure Fryer Wiring Diagrams 56 Figure 20 LGF FC 220V 60HZ 1 Phase ...
Page 59: ...Gas Pressure Fryer Wiring Diagrams 57 Figure 21 LGF FC 240V 50HZ 1 Phase ...