BT-550 Operation manual
35
P/N : 550-ENG-OPM-EUR-R01
Bistos Co., Ltd.
2018.03
1.
Connect the power cord to the power
inlet connector of BT-550. In the
basic configuration, the power inlet
connector is located under the
column. In the full option
configuration, it is located behind the
stand assay. Clip the power cord to
prevent detached unintentionally.
2.
Connect all cables and sensors to the
relevant connectors. Be sure to
connect the cables and sensors to the
right connectors.
3.
Turn on the power and check
whether the product logo and initial
screen is displayed.
4.
After booting sequence finished, the
main screen will be displayed. Check
whether all the relevant information
are displayed
5.
When the power on, BT-550 start to
operate in ‘pre warm’ mode with
100% heater output (28
㎽
/
㎠
±20%)
for five minutes. After then the
heater output decrease to 60% for 10
minutes and further decrease to 25%.
WARNING
Securely latch the power cord to prevent the power cord unintentionally detached
from power inlet connector.
Do not pull or push when connecting or disconnecting connector from or to main
body in force. Check the shape, position and direction of connector.
2.7 Operation
Figure 2-9: Power cord
Figure 2-10: Product logo and initial screen