LISTS OF INSPECTION
PRE-DELIVERY INSPECTION MADE BY BISON DEALERSHIP
After the Subsoiler has been completely adjusted, check it and make sure it is ready for proper
operation before delivering it to the customer. The following list is a reminder of the items to
inspect. Check each item if it has been found satisfactory or after the proper adjustments have
been made.
■ Make sure that the Subsoiler has been properly assembled.
■ Verify that the bolts, nut and set screws are tight.
■ Verify that the shanks have been installed to the customer's desired rotation width.
■ Clean the Subsoiler and touch up any places where the paint is lifted or scratched.
■ Make sure all decals are properly positioned and undamaged.
■ Ensure that the machine carries the options that the customer requires.
Date of Assembly___________Name and Signature of Technician_______________
03
Summary of Contents for SVH-1
Page 1: ...Models SUBSOILER OPERATOR S MANUAL Part No 4350 2135 01 SVH SVH SVH 1 SVH 5 3 SVH 9 5...
Page 2: ......
Page 30: ...25...
Page 32: ...27 PARTS CATALOG SVH 1 SUBSOILER 1 FIXED END WITH FUSIBLE SCREW...
Page 45: ...40 NOTES...
Page 46: ...PART No 4350 2135 01 2016 Tecnomec Agr cola S A de C V Rights reserved 41...
Page 47: ......
Page 48: ......