LISTS OF INSPECTION
POST-SALES INSPECTION
It’s advised that the following items are constantly checked during first hours of operation.
■
Fully check the machinery and certify there are no damaged parts.
Repair or change if necessary. AII guards shall be in place.
■
Check there are no loose or missing screws. lf possible, operate Subsoiler to check proper
operation.
■
Check during Subsoiler operation that there is no interference between hoses and mobile
parts that can be damaged.
■
Check the operator's manual in full with your client and highlight importance of a regular and
proper lubrication as well as safety precautions.
Inspection Date____________ Name and Signature___________________________
MORNING OPERATION INSPECTION
Lube all points in need of daily lubrication and those that require lubrication at a recommended
time.
■
Ensure all screws are complete and parts tight.
■
Check that mounting components are safe.
SEASONAL INSPECTION
■
Check general state of Subsoiler (normal wear and tear, no bumps, no leaks in ducts, etc.)
■
Ensure that proper lubrication has been made.
■
Ensure that the proper operating adjustments are made.
05
Summary of Contents for SVH-1
Page 1: ...Models SUBSOILER OPERATOR S MANUAL Part No 4350 2135 01 SVH SVH SVH 1 SVH 5 3 SVH 9 5...
Page 2: ......
Page 30: ...25...
Page 32: ...27 PARTS CATALOG SVH 1 SUBSOILER 1 FIXED END WITH FUSIBLE SCREW...
Page 45: ...40 NOTES...
Page 46: ...PART No 4350 2135 01 2016 Tecnomec Agr cola S A de C V Rights reserved 41...
Page 47: ......
Page 48: ......