Summary of Button Functions
3.3 Pre-Commissioning Check
Confirm all below points prior to start-up:
• All inputs, output and drain are correctly installed to their corresponding connections.
• The power supply meets the requirements as indicated in the product specifications.
• Input water pressure is 2-7 kg/cm
2
.
• The area of operation is well ventilated (Min. 5 air
changes per hour
).
3.4 Initial Start-Up
The system is switched ON either controlled by OWS-Series or an external closed contact
switch. To use the machine at the first time, connect the machine to your selected signal
source for switching on and the “preparing” light will begin to flash slowly. At this point,
the machine is in preparation stage refilling water for
iEOG start-up
. This process will
take about 40 to 90 minutes depending on models, ambient and water temperature and
on-site water pressure.
Note: System draining during this stage is normal.
Functions
Operation Instructions
Switch temperature between °C
and °F
•
Press “
▲
” (page-up) or “
▼
” (page-down) key under
standby mode.
Display part remaining life-time
information
•
Press “select” key under standby mode (Temperature
display).
•
Use “
▲
” (page-up) or “
▼
” (page-down) key to display
data.
•
Press “setting” key to return.
Display operational code
•
Press and hold on the “setting” key for 15 seconds to
display the system operation codes.
•
Use “
▲
” (page-up) or “
▼
” (page-down) key to switch
between each displayed codes group.
•
Press “select” key to return.