
BRS-LCi PLC
6 Putting into operation
EN - 21
6.8.3 Control box
The control box regulates the sequence control and the rotary control.
It enables cycle monitoring and status indication.
BRS pin assignment
1
HAN 3A5Q
2
HAN 16 A
3
Rotary check
4
Stroke down
5
Stroke up
6
Clamp open
7
Proximity switch (sensors)
8
Solenoid valves
9
Clamp
10
Cycle timeout
11
Ready
12
Error
13
Stroke cylinder
14
Inject
Fig. 14
Control box
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Fig. 15
HAN 3A5Q pin assignment
Pin no.
1
2
PE
3
4
5
Pin no.
2
1
PE
3
4
5
Start torch cleaning output 24 V DC
Spray output ON 24 V DC
Continuous voltage 24 V DC
0 V DC
Torch cleaning finished input
PE
0 V DC
Continuous voltage 24 V DC
PE
Start torch cleaning input 24 V DC
Spray input ON 24 V DC
Torch cleaning finished output
Summary of Contents for BRS-LCi SPS
Page 4: ...DE 4 1 Identifikation BRS LCi SPS ...
Page 34: ...EN 4 1 Identification BRS LCi PLC ...
Page 64: ...FR 4 1 Identification BRS LCi API ...
Page 94: ...ES 4 1 Identificación BRS LCi PLC ...
Page 123: ...BRS LCi PLC Notas ES 33 Notas ...