background image

For Queries and Help please call Product Support:

 

01909 768840

*OD]LQJVWULSVDQGȴ[LQJVIRXQGLQSDFNVΖIQHFHVVDU\

IWDQGIW([WHQVLRQ.LWFRQWDLQVDGGL

WLRQDOVWULSVIUDPLQJDQGȴ[LQJNLW

[%XLOGLQJ:RRGNLWVFRQWDLQV

DOOVWULSVIUDPLQJȴ[LQJVDQGΖQVWUXFWLRQ

IRUWKHEXLOGLQJVL]H

7UXVVSDFNFRQWDLQVUDIWHUVDQGFROODUWLHVΖIQHFHVVDU\

:KHUHWRȴQGHYHU\WKLQJ

+$1'<7Ζ36RUWȴ[LQJVDQGZRRGNLWE\VL]HDQGSLHFH

EHIRUHVWDUWLQJȋ$OOSDFNOLVWIRXQGDWWKHHQGRIGRFXPHQWȋ

/D\ȵRRUVHFWLRQVZLWK

-RLVWVIDFLQJXSZDUGV

Floor Stages (SS & TG)

Back

Side

66ȵRRULVVDPHOD\RXW

S50 x 8

Use a suitable drill bit for pilot hole

- 3mm is recommended for most.

3mm or 4mm

Avoid splitting wood by pre-

drilling pilot holes for all screws

This is needed for all screw codes:

S12, S30, S40, S50, S70 and S100

IMPORTANT: Pre pilot drill 

all screw holes

 Pilot Drilling

Building Size Floor Sections Roof Sections

10 x 10
12 x 10

  16 x 10

   20 x 10

6

6

6

6

8

8

10

10

Please note on the number of Floor and Roof

sections according to your building size.

Floor / Roof Details

Recommend

x2 for speed

1

2

3

4

8

5

9

6

7

Approximate building time is

6 to 10 Hours assembly 

based on experience and size.

1. Cordless drill

2. Phillips bit

and drill bits

3. Hammer

4. Measuring Tape

5. Pencil

6.Utility Knife

7. Woodsaw 

8. Step ladder

9. Spirit level

 What you need

1

4

5

6

2

3

Summary of Contents for NS-0060

Page 1: ...if necessary BEFORE YOU START 10ftGABLE CoveredSizes 10x10 12x10 16x10 20x10 CODE INS 0060 TONGUE GROOVE WINDOWED WINDOWLESS 10ft Expert Reverse Apex Shed Building Instructions Please read the instruc...

Page 2: ...tions to be thought of before constructing the building how to maintain your building upon completion This section is also aimed at ensuring you are aware of considerations such as location for constr...

Page 3: ...We recommend that tower playhouses are positioned on a at level base raising the legs away from ground moisture Please read the Protecting Playhouse Tower Legs section of this document for more detai...

Page 4: ...Use a suitable drill bit for pilot hole 3mm is recommended for most 3mm or 4mm Avoid splitting wood by pre drilling pilot holes for all screws This is needed for all screw codes S12 S30 S40 S50 S70 a...

Page 5: ...m FR 0100 SQ 2QO MRLQ D PD RI RRUV WRJHWKHU EHIRUH WXUQLQJ Lay gable panel Fix bottom rails Repeat for all Gable Panels Gable Panel Stages S50 x 3 FR 0823 SQ x 1 823 mm Wall Panel Stages Back Side 7 3...

Page 6: ...Top View Diagram Central Gable Fixing Stages Fix one of the Central Gables to the top of a 4ft Plain Panel 4ft Plain Panel S50 x 4 S50 x 6 Pilot drill holes EHIRUH LQJ S50 x 6 Pilot drill holes EHIRU...

Page 7: ...24 TR 2250 BV2 x 2 TR 1632 BM75 x 2 TR 0491 BV2 x 2 Flip truss over and repeat D DQG WKH 6LGH DEOH 3DQHO 7RS DEOH HQWUDO IW 3ODLQ 3DQHO S50 x 18 Truss Fixing Stage Use the Door Gable Sections to align...

Page 8: ...m or 1172mm is the width of a Roof Sheet Measure from the framing to the centre of the Truss Truss Position Diagram Side View 879mm or 1172mm Heavy Duty only Halfway point 19mm Truss S50 x 6 FR 0879 S...

Page 9: ...ition Side View Incorrect Position Roof Sheet Position Line up the Roof Sheet with the framing not the cladding 2 2 1 S50 x 12 FR 1631 BV2 1631mm Roof Sheet requires Roof Support only 7KH 5RRI 6KHHW V...

Page 10: ...G roof Fix bottom rails Repeat for all T G roof sections T G Roof Only S50 x 3 FR 0879 SQ FR 1172 SQ x1 823mm or 1116mm Side View Correct Position Side View Incorrect Position T G Roof Position Line...

Page 11: ...RVV WKH 5RRI 7UXVV S70 x 10 Position the Roof Sheet square with UVW VKHHW and push up to the centre S70 x 10 Position the Roof Sheet square with the framing S70 x 10 Push the Roof Sheet up to the cent...

Page 12: ...outside of cladding S50 x 8 FR 1651 SQ x 2 1651mm S70 x 10 Push the Roof Sheet up to the centre This will require 2 people and make the building ridgid S50 Screw the Wall Panels to the RRU Hinges to...

Page 13: ...mm Gap S30 x 18 CL 1754 40RS S30 x 4 1700mm This will require cutting to size S30 x 24 x 6 Windowed Fixing Stage WS x 1 GL x 1 S30 x 3 CL 0532 SQ x 1 532mm Windowed Building Only Do not screw through...

Page 14: ...to size CL 1754 40RS 1754mm This will require cutting to size Do not screw through the glazing S30 x 6 CL 0532 SQ x 2 GL x 1 532mm WS x 1 Windowed Building Only Cloaking Strip Fixing Stage Windowless...

Page 15: ...er Eaves T10 Mineral Felt Sand Felt T8 T10 Fold over Corner 100mm Felt Fixing Stage Length of roof 140mm x 4 FrontView 10ft Gables 4 PIECES OF FELT Felt Felt Felt Felt STAGE 1 STAGE 3 STAGE 4 STAGE 2...

Page 16: ...r Shingles Roof Covering Only For Shingles Roof Covering Only Only 1 roll of felt is used as a starter layer for the Shingles Cut the full roll of felt in half lenght ways x 1 N30 CL 1754 40RS 1754mm...

Page 17: ...for 10x10 20x10 Building Treat after assembly and annually to protect Protect your building 12x10 Expert T G Windowed Shown Same for 10x10 16x10 Building Treat after assembly and annually to protect...

Page 18: ...ming Rough Sawn Homegrown FR 0823 SQ 0 823 4 Door Bracing 28mm x 28mm Framing Rough Sawn Homegrown FR 0900 BV2A 0 900 58 58 4 Top Bottom rails 28mm x 28mm Framing Rough Sawn Homegrown FR 1116 SQ 1 116...

Page 19: ...21 PT Component Woodkit FR 0823 SQ 28mm x 28mm Framing Rough Sawn Homegrown FR 0823 SQ PT 0 823 4 Door Bracing 29023 PT Component Woodkit FR 0900 BV2A 28mm x 28mm Framing Rough Sawn Homegrown FR 0900...

Page 20: ...Homegrown FR 1116 SQ 1 116 4 Barge Boards Purlin 28mm x 28mm Framing Rough Sawn Homegrown FR 1172 SQ 1 172 3 Fixing Kit 25561 Fixing Kit Extension Apex 3ft and 4ft Plain FK 3ft 4ft A PL 1 Woodkit Ext...

Page 21: ...00 SQ PT 0 100 2 Top Bottom rails 29024 PT Component Woodkit FR 1116 SQ 28mm x 28mm Framing Rough Sawn Homegrown FR 1116 SQ PT 1 116 4 Barge Boards Purlin 29025 PT Component Woodkit FR 1172 SQ 28mm x...

Page 22: ...awn Homegrown FR 0823 SQ 0 823 4 Barge Boards Purlin 28mm x 28mm Framing Rough Sawn Homegrown FR 0879 SQ 0 879 3 Fixing Kit 25561 Fixing Kit Extension Apex 3ft and 4ft Plain FK 3ft 4ft A PL 1 Woodkit...

Page 23: ...00 SQ PT 0 100 2 Top Bottom rails 29021 PT Component Woodkit FR 0823 SQ 28mm x 28mm Framing Rough Sawn Homegrown FR 0823 SQ PT 0 823 4 Barge Boards Purlin 29022 PT Component Woodkit FR 0879 SQ 28mm x...

Page 24: ...ilver 6 Fixing Kit Building Apex 4ftx10ft U1754 25639 FINAL PART CHECKING TO BE FILLED IN BY THE FINAL PACKER OR CHECKER I __________________________ have checked that all components have been packed...

Page 25: ...25561 FINAL PART CHECKING TO BE FILLED IN BY THE FINAL PACKER OR CHECKER I __________________________ have checked that all components have been packed in good quality on ____ ____ __________ Kybotec...

Page 26: ...own Bevelled x2 TR 2250 BV2 2 250 24 24 2 Truss 38mm x 75mm Framing Rough Sawn Homegrown Birdmouth x2 TR 1632 BM75 1 632 24 64 2 Screws 50mm Screw S50 0 050 36 Truss 10ft Pack Treated 25405 Pack List...

Page 27: ...onent Truss TR 2250 BV2 19mm x 75mm Framing Rough Sawn Homegrown Bevelled x2 TR 2250 BV2 PT 2 250 24 24 2 Truss 29012 PT Component Truss TR 1632 BM75 38mm x 75mm Framing Rough Sawn Homegrown Birdmouth...

Page 28: ...elled x2 Z File WS BLK 586 0 586 2 Cloak Strip 11mm x 40mm Cloak Strip Rough Sawn 11x40RS CL 0532 40RS 0 532 3 Screws 30mm Screw S30 0 030 9 Glazing Pack Fits 4ft Fixed Window Section W0 566xH0 530 25...

Page 29: ...Y FW 566x530 2 Window Sill 14449 19mm x 75mm Framing Rough Sawn Homegrown Bevelled x2 Z File WS BLK 586 0 586 2 Cloak Strip 29013 11mm x 40mm Cloak Strip Rough Sawn 11x40RS CL 0532 40RS PT 0 532 3 Scr...

Page 30: ...m X1 X2 QTY Tick when Packed Roof Support 29007 PT Component Roof Support 10ft Apex L1 631m 28x28 RS FR 1631 BV2 PT 1 631 24 66 4 FINAL PART CHECKING TO BE FILLED IN BY THE FINAL PACKER OR CHECKER I...

Page 31: ...m X1 X2 QTY Tick when Packed Roof Support 29007 PT Component Roof Support 10ft Apex L1 631m 28x28 RS FR 1631 BV2 PT 1 631 24 66 2 FINAL PART CHECKING TO BE FILLED IN BY THE FINAL PACKER OR CHECKER I...

Reviews: