
Assemble The Captain’s Pak
®
Tip-Up Boom To The
Downrigger Base...
Mounting The Multi-Set
®
Rod Holders To The Ball Cradle
Cannonball Holder...
Mounting The Downrigger
And Ball Cradle To The
Mounting Plate...
1. Slide the double rod upper arm assembly (A) onto the
lower hinge assembly (B).
2. Line up the holes and insert the hinge pin (C).
3. Hold the hinge pin in place by fitting the retainer clip (D)
into the groove on the end of the hinge pin.
4. Screw the boom sections (E) into the rod block on the
double rod upper assembly.
(See page 7 for boom assembly instructions.)
1. Mount the Multi-Set
®
rod holders to the ball cradle
using the 3/8 inch nuts and lock washers that are
provided with the rod holders.
2. Rotate the rod holders to your desired position before
securing (as shown in the illustration). Lock the rod
holder in place with the set screw, using a
1/8 inch Allen wrench.
1. Position the ball cradle over the mounting plate that
has been installed on the mounting surface. Then
position the downrigger base over the ball cradle.
2. Fit one of the 1-1/8 inch hold down bolts through
the downrigger base and ball cradle. Locate the
threaded hole in the corner of the mounting plate.
Screw in the first hex bolt, leaving it
untightened.
3. Locate the remaining three hex bolts in the
same manner. Finally, tighten all four hex bolts firmly.
Summary of Contents for Band Buster
Page 1: ......