background image

1

Water Baths

sWB1, sWB1D, sWB2, sWB2D, sWB3, 
sWB3D

Introduction

thank you for purchasing this piece of 
stuart equipment. to get the best 
performance from the equipment, and for 
your own safety, please read these 
instructions carefully before use.

Before discarding the packaging check that 
all parts are present and correct.

These Stuart water baths are designed to 
operate under the following conditions:-

  For indoor use only

  Use in a well ventilated area

  Ambient temperature range +5°C to +40°C

  Altitude to 2000m

  Relative humidity not exceeding 80%

  Mains supply fluctuation not exceeding 10%

  Overvoltage category II IEC60364-4-443

  Pollution degree 2

If the equipment is not used in the manner 
described in this manual the protection 
provided by the equipment may be 
impaired.

electrical Installation

thIs INstrUMeNt MUst Be eartheD

Before connection please ensure that the 
line supply corresponds to that shown on 
the rating plate. these models require a 
supply rated at 220 - 240V ac, 50hz, single 
phase.

All models are supplied with two mains leads 
fitted with IEC plugs for connection to the 
instrument. One has a UK 3 pin plug and the 
other has a 2 pin "Shuko" plug for connection 
to the mains. Choose the lead appropriate for 
your electrical installation and discard the other. 
Should neither be suitable, take the lead with 
the UK plug and replace the plug with a suitable 
alternative. This involves cutting off the moulded 
plug, preparing the cable and connecting to the 
re-wireable plug in accordance with its 
instructions.

Model 

Power

SWB1/SWB1D 

750W

SWB2/SWB2D 

1kW

SWB3/SWB3D 

1.5kW

CaUtION - Fuse fitted in both live and 
neutral lines.

The wires in the mains cable are coloured as 
follows:

BROWN   

-  LIVE

BLUE 

 

-  NEUTRAL

GREEN/YELLOW  -  EARTH

All models are supplied with a mains lead fitted 
with an IEC plug and IEC socket in the rear of 
the instrument. This lead should be connected to 
the instrument BEFORE connection to the mains 
supply.

Should the mains lead need replacement, a cable 
of 1mm

2

 of harmonised code H05W-F connected 

to an IEC 320 plug should be used.

IF IN DOUBt CONsULt a QUaLIFIeD 
eLeCtrICIaN

Summary of Contents for Stuart SWB1

Page 1: ...Version 2 0 Water Bath SWB1 SWB2 SWB3 SWB1D SWB2D SWB3D Instructions for use w a t e r b a t h over temp press to set set load off mains on on 0 C 20 40 60 80 100C SWB2D 39 9...

Page 2: ...n on 0 C 20 40 60 80 100C SWB2D 39 9 Fig 1 SWB2D Operation panel Mains On Off Temperature control Set switch digital models only Heater On Off Display digital models only Over temperature digital mode...

Page 3: ...a supply rated at 220 240V ac 50Hz single phase All models are supplied with two mains leads fitted with IEC plugs for connection to the instrument One has a UK 3 pin plug and the other has a 2 pin Sh...

Page 4: ...ion Position the apparatus on a firm level surface Place the perforated platform over the element and fill with water to the desired level It is advisable to use distilled or deionised water to avoid...

Page 5: ...Service Department of Bibby Scientific Ltd or the point of sale For any other technical enquiries please contact the Technical Support Department E mail stuarthelp bibby scientific com Tel 44 0 1785...

Page 6: ...m Net weight 6 1kg 8 7kg 12 3kg Heater power 750W 1000W 1500W Electrical supply 230V 50Hz 230V 50Hz 230V 50Hz SWB1D SWB2D SWB3D Nominal capacity 6L 15L 24L Temperature range Ambient 5 C Ambient 5 C Am...

Page 7: ...ications We cannot be sure that other equipment used in its vicinity will meet these standards and so we cannot guarantee that interference will not occur in practice Where there is a possibility that...

Page 8: ...Nemours Cedex France Tel 33 1 64 45 13 13 Fax 33 1 64 45 13 00 e mail bsf bibby scientific fr www bibby scientific com Bibby Scientific Italia Srl Via Alcide de Gasperi 56 20077 Riozzo di Cerro al Lam...

Reviews: