Page 10 of 24 M7159 iss 4.4
7. EQUIPMENT OPERATION.
7.1. The illustrations below show detailed layout of the MC242 control unit.
230V illustration
1
Mains Output IEC socket.
2
Earth continuity test point
3
Dataplate label.
(See for correct voltage type).
4
IEC mains input socket
5
Rod support clamp.
6
Mains power on neon lamp.
(White).
7
Mantle / Bunsen heaters on neon lamp.
(Amber).
8
Regulator control knob.
115V illustration( x1 variant).
1
Mains Input Cable
2
Mains Fuse
3
Earth continuity test point
4
Mains Output IEC socket.
5
Dataplate label.
(See for correct voltage type).
6
Rod support clamp
7
Mains power on neon lamp.
(White).
8
Mantle / Bunsen heaters on neon lamp.
(Amber).
9
Regulator control knob.
Check the Dataplate label and ensure your mains electrical supply voltage is compatible
with this product.