Biasi SG Series
Page 23
1. Install the control panel to the casing bracket as described on the previous page.
2. Insert both the temperature gauge probe and the temperature limit probe from the SG
control panel into the immersion well all ready installed in the front of the boiler.
Do not
install the 7248 probe into the front immersion well.
3. Remove spring clip from well and reinstall the clip over the capillary lines for the probe.
4. Install pressure adapter (Part #1) into lower tapping on front of boiler. Be sure not to get
any sealant on the adapter end of the fitting.
5. Install the capillary fitting (Part #2) into the pressure adapter.
11. Control Panel Sensor installation
1
2
1. On/Off Switch
2. Pressure Gauge
3. Temperature Gauge
4. Operating Temperature Control
11. Control Panel Legend
1
3
2
4
Summary of Contents for SG 2
Page 2: ...Page 2 Biasi SG Series...
Page 26: ...Page 26 Biasi SG Series 12 1 Oil Burner Wiring...
Page 27: ...Biasi SG Series Page 27 12 1 Oil Burner Wiring...
Page 28: ...Page 28 Biasi SG Series 12 2 Gas Burner Wiring TO EARTH GROUND LINE HONEYWELL 7248U...
Page 29: ...Biasi SG Series Page 29 12 2 Gas Burner Wiring...
Page 37: ...Biasi SG Series Page 37 Notes...
Page 38: ...Page 38 Biasi SG Series Notes...
Page 39: ...Biasi SG Series Page 39 Notes...