BGS technic KG
Bandwirkerstr. 3
D-42929 Wermelskirchen
Tel.: 02196 720480
Fax.: 02196 7204820
www.bgstechnic.com
© BGS technic KG, Copying and further use not allowed
ASSEMBLY PROCEDURES
Step 1 – Attach Wheel Assembly to Base (Optional)
•
Please line up holes in wheel bracket
with corresponding holes in base.
•
Please be sure that the wheel
assembly is parallel other base and
fully tighten bolts.
Required parts:
Small bolt 2 pcs.
Flange nuts 2 pcs.
Flat washer 4 pcs.
Step 2 – Attach Support Brackets to Base
•
Attach three support post loosely to the
base with three small bolts downward
through support post into the base.
Required parts:
Small bolt 3 pcs.
Step 3 - Attach Post to Support Post
•
lnstall post onto three support posts.
•
Attach post to support post using six large
bolts & six large nuts.
Required parts:
Large Bolt 6 pcs.
Large Nuts 6 pcs.