10
Version 1.01 June 2015
STEP 8
: Lift the upper line to make
sure the folds are neat along the
whole length of the panels and that
the wind channel is cleary right up to
the apex of the canopy.
STEP 9
: Check both lower and both
upper lines to make sure that they
run freely from the canopy to the
riser(s).
STEP 7
: Check the number of panels
on each side is identical, and matches
the SPECIFIC model. Take the time
to verify that the leading edge is
perfectly aligned.
STEP 11
: Squeeze the air out of the
canopy then REMOVE THE TIE
WHICH HOLDS THE FOLDING
LOOPS TOGETHER. (See inventory
list).
STEP 12
: Take the container and place
it under the folded chute, so the flap
with the rubber fitting is under the
canopy.
STEP 10:
S-fold the left and the right
side of the canopy one after the
other in the direction to the centre
of the chute. Keep the canopy neatly
folded using sandbags.
Packing
Summary of Contents for Oops Reserve
Page 1: ...1 Version 1 01 June 2015 ...