Fig. 21 - Smoke Match Position for Spillage Test
3.7
RE-FITTING THE CANOPY
a)
Following successful completion of the spillage test as detailed in
section 3.6, refit the canopy as shown below in Fig. 22
Fig. 22
27
Sectional View
through fire / casting
Smoke Match Position - 10mm
below edge of INNER canopy on
firebox
M5 Wingnut and 2 off locating
pegs used to secure the cast
canopy as shown