background image

 

                                                           

PAGE 1 

Add: Floor3,Building A,No.257,Junye Road,Huangpu District,Guangzhou,China 
E-mail:[email protected]                                                  Http://www.bevsinfo.com 

 
 

                                                                                                                                   

Wet Abrasion Scrub Tester 

BEVS 2805 

User Manual

 

 

 

 

 

 

 

 

 

Version V3.201704                                                         

This manual shall be read carefully before starting. Directions included in this operation manual 
shall be strictly followed. 
 

Summary of Contents for BEVS 2805

Page 1: ...rict Guangzhou China E mail sales bevsinfo com Http www bevsinfo com Wet Abrasion Scrub Tester BEVS 2805 User Manual Version V3 201704 This manual shall be read carefully before starting Directions in...

Page 2: ...uangpu District Guangzhou China E mail sales bevsinfo com Http www bevsinfo com Content 1 Company Profile 3 2 Product Introduction 4 3 Operation Introduction 6 4 Maintenance 10 5 Attention 10 6 Order...

Page 3: ...ainting resin testing instruments and laboratory whole solution We offer the complete and unique products in this field to meet customer s challenging demands of today and tomorrow the products are co...

Page 4: ...parability of performance between the two test heads which operate side by side 2 2 Safety Instructions 1 Read this instruction manual carefully before switching on the instrument 2 Keep this instruct...

Page 5: ...ning about the residual risk as below Moving parts impact crushing impact 2 3 Intended use Paint coatings leather wood plastic printing materials fiber and etc 2 4 Features Big LCD design touch screen...

Page 6: ...ddle of light stainless steel trough plate 3 Install and clamp the test panel well put the brush into the stand 4 Connect circuit and power on 5 Refer to 3 3 Touch Screen Use 6 Open the injection pump...

Page 7: ...ow and scrub times 1 Reagent Flow Setting Press button to increase flow volume press button to decrease flow 2 Scrub Times Setting Slide to right to increase the scrub times slide to left to decrease...

Page 8: ...unye Road Huangpu District Guangzhou China E mail sales bevsinfo com Http www bevsinfo com 3 3 6 Press stop button to end the test and the machine will be stop automatically when reaching the preset m...

Page 9: ...imes and scrub speed on the desk when opening the desktop lock 3 4 2 System Setting 1 Screen brightness is adjustable 2 Language Chinese or English 3 Turn on or off the buzz 4 When opening the power s...

Page 10: ...tion every month 5 Once a year disconnect from mains Tilt machine on its back remove base and undo screws located in each corner Clean two slide rods and regress using Lithium grease Replace base and...

Page 11: ...ilding A No 257 Junye Road Huangpu District Guangzhou China E mail sales bevsinfo com Http www bevsinfo com 7 Packing List BEVS 2805 Main Machine 1pc User Manual 1pc Stylus 1pc Power Lead 1pc Certific...

Reviews: