Installing Flavors

 

1. Locate the appropriately labeled box and line (we recommend labelling 

your lines if they are not already marked).  

2. Hold the QDC by placing the index finger of your left hand under the 

flavor line and the index finger of your right hand under the capped 
flavor peg on the other side of the QDC. 

3. Place your thumbs on the side tabs on top of the QDC and press them 

outwards, sliding the center back until it fully disengages and clicks 
twice.  
 

 

 

Proper holding technique for a QDC 

 

4. Slide the connector sideways and off the spout of the bag. The old box 

can now be removed and discarded.  

5. Open a new box of flavor concentrate by pressing in on the perforated 

area. The label should be inspected to confirm flavor number and 
ensure it is not expired.  

6. Pull the spout out of the opening and ensure that the bag is not 

bunched up and that concentrate can freely get to the spout.  

7. Remove the cap from the spout. This can be discarded or kept with the 

box to recap the bag upon removal. Ensure that the spout faces 
upwards when doing this to avoid spills. 

8. Place the new box in the appropriate area, checking that the spout is 

facing outwards and hangs down slightly so concentrate can freely flow 

 

                                                   

© 2018 Bevi. All rights reserved.                                                   [email protected]

 

 

Summary of Contents for Standup v1.0

Page 1: ...Bevi v1 0 Installation Guide Last Revision January 2019...

Page 2: ...where it can be overseen by trained personnel The appliance must not be cleaned by a water jet For indoor use only 10 32 C 50 90 F Appliance shall not be installed in an area where a water jet could b...

Page 3: ...Ice Bank Installing the Carbonator Attaching Water Lines Installing the CO2 Tank Installing Flavors Checking the Lines Initializing the Service Panel Connecting to the Internet Initial Stocking Creat...

Page 4: ...the Partner Resource site at partners bevi co Bevi Components Bevi ships on a pallet that contains the internal components for the machine as well as the chassis For detailed information on each comp...

Page 5: ...Flow Compensator and Line Filter Out ow Line with Pressure Regulator Pentek OR 3M Filter CO2 Regulator Drip Tray 2018 Bevi All rights reserved support bevi co...

Page 6: ...use or smaller it will cause ow problems and machine damage Additionally the following components are not included with the unit by default but are necessary for install Flavor Concentrate Boxes 4 10...

Page 7: ...hin 50 ft of the unit Electrical 110 120 VAC 60 Hz 9A max current draw GFCI protected 3 prong outlet Space At least 3 ventilation room behind the machine the Bevi is 22 deep Measuring Water Pressure I...

Page 8: ...ut aside 2 Place the drip tray on the bottom of re ll station and slide into place 3 Plug the Bevi power adapter into back of Bevi then into power outlet do not turn on power switch yet 4 Screw the Wi...

Page 9: ...r out ow line and pressure regulator to the outlet of the lter housing 10 Turn the power button on the back of the machine on to ensure power is working The tablet should turn on and the lights above...

Page 10: ...bove 6 Doing so will cause the carbonator to freeze and can damage the unit Installing the Carbonator 1 Lock the wheels of the Bevi so they do not roll and lift the carbonator into the unit with the o...

Page 11: ...e on the CO2 tank so gas begins to ow and ensure that the valve on the regulator is open pointing downwards 5 Ensure that the pressure on the top gauge the one closer to the CO2 tank reads 87 psi 6 ba...

Page 12: ...and off the spout of the bag The old box can now be removed and discarded 5 Open a new box of avor concentrate by pressing in on the perforated area The label should be inspected to con rm avor number...

Page 13: ...It should only take 30 seconds or so for the touchscreen to boot up Initializing the Service Panel The service panel can be accessed from the main tablet touchscreen To enter the panel 1 Press the Ing...

Page 14: ...l Connecting to the Internet To connect to a network 1 Press the Change button on the top of the service panel 2 Select the appropriate connection type from the three options 2018 Bevi All rights rese...

Page 15: ...ge and check that the internet is properly connected The icon on the left of the network eld should be green with a Connected tag and the connection type listed Initial Stocking Flavors For each avor...

Page 16: ...en properly connected to the internet the page should update itself within a few minutes with the current inventory Final Steps Purging the Carbonator To ensure that the CO2 and water mix properly per...

Page 17: ...Incubation IMPORTANT NOTE Incubation is a mandatory part of the installation process Without it the Bevi temperature will be too high to properly operate Do not skip this step 1 Once all components ar...

Page 18: ...Email support bevi co 2018 Bevi All rights reserved support bevi co...

Reviews: