Beton Trowel nv
Nijverheidsstraat 11
1840 Londerzeel/Belgium
Tel: +32 (0)52 315 350 - Tel: +32 (0)52 315 351
Fax: +32 (0)52 303 739
E-mail: [email protected]
BE 0821.249.312
www.betontrowel.com
BNP FORTIS:
ING:
BE81 0015 9813 5624
BE
- GEBABEBB
BBRUBEBB
Pag.
6/35
Assembly Instructions
1
Battery
– Shipped dry – No acid
Connect and secure the battery cables before attempting starting procedures.
2
Steering handle assembly
The steering handles are shipped ready to connect.
Position the handles over the handle sleeves so that the set-screws (2 per handle)
are lined up with the tapped holes on the sleeves. Tighten the set-screws and test
the mobility of the handles.
3
Pitch control Assembly
Bolt pitch control tube (C) to pitch
control bracket (D) with bolts provided.
Put cable end (E) through yoke arm
(F) and secure with nylon insert
locknut (G). For proper cable
adjustment, turn crank (A) counter-
clockwise to the stop position. Tighten
nut (G) until all slack in the cable is
removed. If more than 2 or 3 threads
show through the nut, it should be
turned back and the guide screw (B)
moved to the next lower hole. Tension
in the cable should then be readjusted.
After adjusting tension, turn hand
crank full clockwise (ABOUT 24
TURNS) and check for clearance
between the yoke arm (F) and the gear
box at point (H). There should be
enough space to pass a business card
through but not more than 1/8 inch.