8
1. Remove the hardware from the Manual bag.
2. Raise the handle to the operating position and fasten
with the two 1/2” x 5/16” bolts (A).
3. Tighten the other two bolts securely (A).
4. Hook the lanyard on the 1” bolt on left side of the ma
-
chine and fasten it with the Ny-Lok nut supplied.
5. Cut the bands, remove the wheel chocks, lean the
machine back so that the small wheels are touching
the pallet, roll the machine forward and lower the large
wheels to the floor. Tip the machine up into the operat
-
ing position.
6. Tip machine back and ensure the center lock is tight.
(See “Pad Installation Instructions” on page 10).
7. Connect the po cable to the + post on the upper
battery (B).
8. Remove the key from the manual bag and insert it in the
key switch located under the battery box cover (C).
9. To operate the machine turn on the key switch, release
the safety lock and squeeze the trigger on the handle
(D).
10. The machine is equipped with the high speed burnishing
pad that was used in testing the machine and is ready to
run.
INITIAL SETUP AND OPERATION
A
1. The machine is equipped with a manual pad pressure
adjustment knob (E) and meter (F).
2. To increase pad pressure, open the battery compartment
cover and turn the knob (E) counter-clockwise.
3. The pressure meter (F) will move up as the pad pressure
is increased.
4. To decrease pad pressure, open the battery compart-
ment cover and turn the knob (E) clockwise.
5. The pad pressure should be decreased if the pressure
meter is in the red. Use of the machine with too much
pad pressure will trip the circuit breaker.
PAD PRESSURE ADJUSTMENT
D
F
A B
A
C
E
D