26
28/10/2019 – Nylofor
®
- Installation manual
2. Installation of the fencing systems
2.
Installation of posts & panels
3.
Bekafix Super
PLACING THE POSTS INTO CONCRETE
-
Place the first 2 posts in the foundation holes and fill them with
moderately wet concrete (not liquid). The concrete is pressed firmly,
which allows the panel to stand upright without support. Check whether
the post is vertical. Keep a distance of approx. 5 cm between the bottom
of the panels and the ground
-
In order to build the rest of the fence the next panel must be hooked into
the hook cap
-
The next post is placed in the foundation hole and hooked onto the panel.
The panel is attached to both posts with the fixators. For extra security
use the bolt and breaking-off nut
-
Repeat the steps above for the entire fence
2
3
4
Summary of Contents for Nylofor Bekafix
Page 1: ...Securing What Matters Nylofor Installation manual EN ...
Page 41: ......