2.
Remove 2x4 wall braces and
cut to fit under second beam..
3.
Repeat to install the other 2x6
beam. Install the beam to the
side of the double studs facing
the back of the building.
.
Double Stud
2x6 Beam
76-1/4" 2x4 Board
1.
Install the front 2x6 beam to the side of the double studs facing the front of the building. Place
the notch under the top plate. Cut to fit under the beam the (2) two 2x4s removed from pallet.
Toenail to beam with 10d sinkers. Further secure the beam with a 2-1/2" wood screws through
the top of the wall plate.
Important: When installed properly the 'X' marks will
be facing the front wall on the front beam and the back
wall on the back beam. The beams will be 51" apart.
Step 13
Install 2x6 Loft Beams