1.
Install a gable frame centered on the back wall. Gable plate should be
flush with filler. NOT over OSB. Secure with 10d sinkers.
2.
Install the gable frame on the front wall.
Step 8
Install Primed Soffit and Fillers
Side
Wall
Flush with
Inside of 2x4
4.
Repeat to install soffit on the opposite side wall.
5.
Install (3) three 3-1/2" wide x 48-3/4" primed filler panels over the front and back
wall. Cut the last filler to fit between the soffit on the sidewalls.
Front Wall
Door Opening
7" Soffit
3-1/2" Filler
Step 9
Install Roof Gables
Tongue Edge
Flush
1.
Locate a 7" wide x 48-3/4" primed soffit with 'tongue' and 'LAP' edges. Install over the side
wall with the primed side facing down. The 'tongue' edge should be flush with front wall plate,
NOT over OSB. Tack the soffit with a couple 6d common nails. Installing 2x4 tie plates in a
later step will provide more nailing.
2.
Install (4) four more soffit panels. Cut the last soffit flush with the 2x4 wall plate.