Thank you for purchasing our kit. Please read the following information before beginning construction.
Always check with your local HOA or building code office for any requirements or restrictions.

Tools Required: Hand or Circular Saw

Cordless Drill
Hammer
Pencil

Level
Measuring Tape
6'-8' Ladder(s)

Safety Glasses
Dust Mask
Phillips Screwdriver
Framing Square

Always wear safety glasses when cutting or nailing!

Additional Materials - Not included in kit:

Required: Shingles or metal roofing, Drip Edge, Roofing Nails or Screws, Paint

Optional: Caulk, Ridge Vent

Floor: Wood flooring is sold optionally. You may choose to build your own or pour a cement pad.

Terminology:

Square - Confirm corners are at 90 degrees
Plumb - Confirm walls and trusses are straight vertically
Wall Plate - Top and bottom 2x4s used to frame walls
Tie Plate - 2x4s connecting wall sections together
Header - Spans top of door opening
OSB - Oriented Strand Board
LAP - Edge of siding that overlaps Tongue
Tongue - Edge of siding that is overlapped

Organize:

Unpack all items & organize according to size and type. This will make items easier to find
when instructed.

Review the parts list on the back page. Should there be missing items or sub-par material
contact Best Barns Customer Service.

DO NOT discard any material including the pallet until your project is complete.

Assembly:

Review all instructions before you begin. Please follow steps carefully and in sequence for
successful results.

If you have any questions we are happy to assist you. Please contact us at:

Primed Siding Detail

Remove Watermark

Wondershare

PDFelement

Summary of Contents for cypress 1016

Page 1: ...22 This manual is copyrighted Under the copyright laws this manual may not be copied in whole or in part without consent from RBS Holdings LLC Copyright 2022 Manufactured by RBS Holdings LLC 205 Arlin...

Page 2: ...to build your own or pour a cement pad Terminology Square Confirm corners are at 90 degrees Plumb Confirm walls and trusses are straight vertically Wall Plate Top and bottom 2x4s used to frame walls T...

Page 3: ...to change For a concrete slab install sill sealer as a moisture barrier between the concrete and the wall plates Foam sill sealer can be purchased at home centers in rolls 3 1 2 or wider Material Desc...

Page 4: ...for a total of 2 two gables 4 Select 2 two 62 long 2x4 boards with angled ends to make the first truss Secure the tops together with a 24 wide OSB gusset Turn truss over and install another 24 wide g...

Page 5: ...Edge 60 Wall Plate Tongue Edge Cut Edge A B 3 Nail both wall frames together with 4 four 10d sinkers on each side 4 Square frame measure diagonally corner to corner The measurement should be 141 1 2 5...

Page 6: ...other end wall frame 11 Square wall frame Select a 12 1 2 wide siding panel with a tongue edge Install this panel with the Cut edge flush with the end of the wall frame Install siding flush with the 2...

Page 7: ...wall frame The measurement should be 138 1 2 Install 2 two full width siding panels Install the first siding panel with the LAP edge extending 3 1 2 past the end of the wall frame Install a full width...

Page 8: ...l width siding panel The last siding panel will be installed after the walls are erected on the floor LAP Edge 6 Install 72 wall studs between the top and bottom plates 5 Position 2 two 68 1 2 long 2x...

Page 9: ...4 Top Plate 19 3 4 24 69 1 2 Header Support 2 Install a 48 x 75 3 4 siding panel to the back wall Use 6d galv nails Nail along the adjoining siding panel Step 5A Set Walls 1 Secure the back wall betwe...

Page 10: ...r Nail through studs with 10d sinkers 2x4 Wall Brace Step 5B Set Walls Continued 67 1 2 Door Header 64 1 2 Wall Plate 3 Install front wall frames between the end walls 4 Temporarily install 2 two 2x4...

Page 11: ...3 Finish by installing a 36 long 2x4 4 Repeat to install tie plates on the front wall Step 6 Install Siding on Front Wall 1 Select a full with siding panel and install at the front left corner 2 Insta...

Page 12: ...nside of the building and flush with 2x4s on end wall 2 Install a 10 to 12 long 2x4 block on the back wall using 10d sinkers Secure the truss to the 2x4 block with 2 two 10 sinkers Install 2x4 Block S...

Page 13: ...g should extend no more than 1 2 above the 2x4 frame and 1 1 2 past gable ends 60 Long Z Flashing Roof Gable End Wall Siding Install 2 two 60 pieces of Z flashing across the top of the siding on the e...

Page 14: ...48 long 2x4 next 3 Cut to fit a 72 long 2x4 to finish against gable 4 Repeat to install 2x4 on the back wall 1 Starting from left end wall install the first truss measuring 21 3 4 from the face of the...

Page 15: ...ush with the siding on the other gable 4 Repeat to install 1x4 fascia on the back wall Step 12B Install Trusses Continued 1 Install 72 long 1x4 fascia trim over the 2x4 Truss Header on the front wall...

Page 16: ...row of sheathing will be about 1 below the ridge to allow for optional ridge venting See detail below See supplier of shingles to purchase ridge venting Siding Roof Sheathing 2x4 Truss Header Straight...

Page 17: ...y want to move the trim later when you install the doors 6 Install a 72 long 1x3 trim board centered across the top of the vertical trim 3 4 of siding will be revealed at top of door 2 Install 75 3 4...

Page 18: ...ews 6 Install door hasp on double doors When properly installed the hasp will fold in half to receive locking latch and the screw heads will be covered 7 Install a barrel bolt on the lower back of the...

Page 19: ...ards 6 2x4 48 Plate Boards 6 2x4 10 12 Blocks for Truss Jig 4 1x4 64 3 8 Gable Trim 4 1x4 77 1 4 Corner Trim 4 1x3 75 3 4 Corner Trim 3 1x3 72 Door Trim 2 1x4 74 Fascia Trim 2 1x4 72 Fascia Trim 2 1x4...