1.

Cut (2) two 2x4-8' boards into 2' long blocks.  Butt the 4x4-8' timbers together to make 16'

runners.  Secure the 4x4s together with the 2' long 2x4 blocks and 16d galvanized nails.

Nail 2x4 joist headers and

floor joist to 4x4 runners.

X

X

X

X

X

X

2x4 Joist Header

X

X

16"

16"

15-1/4"

Material Description

Qty. & Size

2x4  Treated Blocking
2x4  Treated Floor Joists
2x4  Treated Joist Headers

4x4  Treated Runners
Flooring: 5/8" or 3/4"
Galv. Spiral Floor Nails
Galvanized Deck Nails

  2 pcs.    8'
13 pcs. 12'
  2 pcs. 16'
  8 pcs.   8'

  6 pcs. 4x8
  3 lbs.   8d
  3 lbs. 16d

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

DOOR W

ALL

It is important that the floor be level and square.  Square the floor as follows: before nailing the

flooring, measure the floor diagonally (corner to corner).  Then measure the opposite corners;
these measurements will be the same when the floor is square.  Toenail frame to the 4x4 runners.

Install the flooring with 8d galvanized nails spaced 8" apart.

3.

Cut 2x4-12' floor joist to 11'-9".  Treated lumber may be thicker than 1-1/2". Take this into

account when cutting the length of floor joists. Shorten joist measurements if necessary to
obtain 12'-0" building width.

2.

Cut (2) two 2x4 joist headers to 15' - 9".  Layout for 16" on center joist spacing. 'X' marks

where floor joist will be placed.

Foundation size is 12'-0" x 15'-9".  Check local building codes in your area, the construction may
have to change.  For a concrete slab, install sill sealer as a moisture barrier between the concrete
and the wall plates.  Foam sill sealer can be purchased at home centers in rolls 3-1/2" or wider.

Constructing Details for Deluxe Floor System

Deluxe floors include 4x4 runners, standard floors do not

2x4 Floor Joist
spaced 16" o.c.

2x4 Joist Header

4x4 Treated Runners

Flooring

Outside Measurement

15' - 9"  Floor Length

12' - 0" Wide

2x4 Blocking

Summary of Contents for Brookfield-R

Page 1: ...r the copyright laws this manual may not be copied in whole or in part without consent from Reynolds Building Systems Inc Copyright 2018 Brookfield R Building Size 12 x16 Revised November 1 2018 Assem...

Page 2: ...by 15 9 long Do Not make the foundation larger than the building size The siding should project beyond the foundation for water to expel properly from the sidewalls The material that is included in o...

Page 3: ...the floor is square Toenail frame to the 4x4 runners Install the flooring with 8d galvanized nails spaced 8 apart 3 Cut 2x4 12 floor joist to 11 9 Treated lumber may be thicker than 1 1 2 Take this i...

Page 4: ...e bottom plate Tip use a 1x4 trim board as a gauge Use 8d galv nails spaced 8 apart 5 Install 2 two more siding panels Cut the last panel to extend 3 1 2 beyond the wall frame X X X X X X 68 1 2 Wall...

Page 5: ...el with the LAP edge flush the end of the wall and extending 3 4 below the bottom plate 5 Install 2 two more siding panels Siding Extends 3 4 Below Plate LAP Edge 1 Gather 4 four 2x4 72 boards and pos...

Page 6: ...ng that overlaps the 12 wall frame You can nail this edge after the wall panels are installed Two separate walls are easier to handle when erecting kit 1 Locate 2 two 45 long 2x4s and 3 three 2x4 72 w...

Page 7: ...h the 2x4 header support and extending 3 4 below the bottom plate Only nail along cut edge until next panel is installed 5 Install a 4 wide siding panel Nail both panels to frame If you are installing...

Page 8: ...e siding now or after the walls are set Siding Extends 3 4 Below Plate 1 Locate 2 two 72 long boards and cut to a length of 60 3 4 These will be used as wall plates Position boards together and indica...

Page 9: ...blocks to the floor using 2 1 2 screws This will ensure that the gable frames and the trusses assembled next are identical 4 Secure the top of the truss rafters together with a 1 x4 barbed metal driv...

Page 10: ...the 2x4 truss rafters at the top with a 8 x 20 wood gusset Apply wood glue between the 2x4s and the gusset Nail the gusset to the 2x4s with 14 fourteen 6d common nails 3 Install 2 two 12 x24 gussets...

Page 11: ...e it overlaps front and back walls at corners 4 Install the 2x4 door header between the front wall panels Nail through the wall stud into the ends of the header Toenail into the top wall plates 5 Remo...

Page 12: ...nails spaced 12 apart 3 Butt a 1x4 6 board against 1x3 corner trim and flush with top plate Nail along top with 8d galv nails Step 10 Install Primed Soffit and Filler 1 Install a 7 wide x 48 3 4 long...

Page 13: ...he end of of bottom plate Use 6d galv nails across the top of the 2x4 frame and gable studs Use 8d galv nails across the bottom plate The siding will extend 3 4 below the bottom 2x4 3 Install center a...

Page 14: ...ch side of the door opening flush with the bottom edge of the siding Tack these boards with a couple nails you may want to move the trim later when you install the doors Use 8d galv nails 6 Install a...

Page 15: ...e 2x4 gable frame when marking the location of the first truss Continue 24 spacing to other gable Important When marking the opposite wall place the X mark on the same side of the line so your trusses...

Page 16: ...sh with the gable siding Use 6d galv nails Siding Filler 2x4 Blocks 1 Set roof trusses Secure trusses to metal hangers with 6d common nails 2 Install short 2x4 blocks at both ends of each truss Secure...

Page 17: ...the 1x4 boards with the top of the trusses Install fascia with 8d galv nails Step 17 Install 1x4 Fascia Roof Sheathing 1x4 6 Fascia Board 4 Install roof sheathing per layout below Make sure the truss...

Page 18: ...e instructions on the wrapper If you need more detailed instructions on installing shingles there are good publications online Building Tip Install ridge vent in lieu of shingles caps Ridge vent provi...

Page 19: ...l door hasp on double doors and closing side of single door When properly installed the hasp will fold in half to receive locking latch and the screw heads will be covered 1 Lay the left door with the...

Page 20: ...48 x 72 2 ea Sheathing 7 16 48 x 48 4 ea Sheathing 7 16 36 1 2 x 72 2 ea Sheathing 7 16 36 1 2 x 48 1 ea Dr Filler 7 16 3 1 4 x 67 7 2x4 for Collar Ties 82 18 2x4 for Truss Rafters 80 1 2 54 2x4 for W...

Reviews: