background image

BESEN INTERNATIONAL GROUP CO., LTD. 

BESEN-GROUP.COM, leading the EV Charging to a better way 

Page 8   

Rated Current 

13A/20A/32A 

Protection Functions 

Leakage Current 

Protection 

Yes (I

n≤30mA, RCD Type A) 

Short Circuit Protection 

Yes 

Lightning Protection 

Yes 

Over-load Protection 

Yes 

Emergency Stop 

Yes 

Charging Connector’s 

Mechanical Life 

10000 times 

Functional Index

 

Charging Connection 

Mode 

Type A/Type C connection 

Status Indication 

LED   

Charging  Control  and 
Guide Function 

Meet 

IEC61851-1 requirements

 

Output Mode 

One / Two inlets 

Communication 

N/A 

Mechanical Parameters

 

Size (mm) 

Pole-stand type (L*W*H): 1253*256*156 

Wall-mounted (L*W*H): 406*250*164 

Installation Mode 

Pole-stand/Wall -mounted 

General Parameters

 

Environment Temperature 

-30

50

 

Atmospheric Pressure 

860hPa~1060hPa 

Relative Humidity 

5%

95% (no condensation) 

EMC Compliance 

IEC61851-22 

IP Degree 

IP55 

2.8 Output Interface 

The charging cable is IEC standard 7 cores, compatible with IEC EVs’ standard. 

2.8.1 Interface Technical Parameters 

 Rated Current: 13A/20A/32A 

Summary of Contents for BS-B10

Page 1: ...European Standard AC Charging Station TUV CE CERTIFICATED User Manual www besen group com ...

Page 2: ...the potential risk and safety information Indicates that failure to conform to the appropriate safety measures will lead to death or to serious injury of the hardware Indicates that failure to conform to the appropriate operating instruction will lead to minor personal injury Notices do not contain any information that draws attention to potentially dangerous or harmful functions ADDITIONAL IMPORT...

Page 3: ...Positioning 7 2 7 Technical Parameters 7 2 8 Charging Cable 8 2 8 1 Interface Technical Parameter 8 2 8 2 Charging Cable Materials and Image Treatment 9 2 8 3 Plug and Socket Image 9 3 Installation 9 3 1 Basic Requirements for Installation 10 3 2 Installation Size 10 3 3 Installation Steps 13 3 4 Electric Wiring 14 4 Operations 16 4 1 Indicated Lights Definitions 16 4 2 Operation Steps 16 5 Mainte...

Page 4: ...oning please read all the information and safety symbol and well known related safe operations 1 3 Safety Information Danger 1 Lighting Stroke or Burning 2 Do not open the wiring cartridge or box of charging station to avoid the injury of electric shock 3 Once the impurities had settled it will result in fire from short circuit and other fault Warning Man made damage and natural damage 1 Please ch...

Page 5: ...ng 1 Ensure all tools are displayed in the proper location for easy access 2 Be sure not leave anything behind after installation and maintenance Notice Installation and Maintenances Precautions Be sure at least two technicians are on site when installation and maintenances until the device is power off completely 1 Be sure at least one technician is to supervise on the proper implementation of al...

Page 6: ...d installation there are so many choices for the EV charging station The end user could select what you need The planning rules are as followed Planning Rules Type A The manual is for Besen Group series EV Charging Station included detailed parameters and installation information For others please refer to relevant manual 2 3 System structure As followed it is the electric schematic diagram of AC ...

Page 7: ...ging Station sketch map G2 2 Circuit Diagram for AC EV Charging Station 2 4 The EV Charging Station Image Besen Group series EV Charging Station adopts the Type A and Type C connection single phase and three phase input and output pole stand and wall mounted installation modes The image is as shown The image shown here is indicative only ...

Page 8: ...o protect personal safety when over load or short circuit fault it is for device protection 5 Lighting Protection Module To limit the overvoltage and prevent the damage 6 Charging Control Module To complete the charging connection control with EVs and collect data etc 7 Charging Control Contactor To control the output of power supply 2 5 Features 1 Easy to operate when plug in it starts if with ke...

Page 9: ...ection Status Indication LED Charging Control and Guide Function Meet IEC61851 1 requirements Output Mode One Two inlets Communication N A Mechanical Parameters Size mm Pole stand type L W H 1253 256 156 Wall mounted L W H 406 250 164 Installation Mode Pole stand Wall mounted General Parameters Environment Temperature 30 50 Atmospheric Pressure 860hPa 1060hPa Relative Humidity 5 95 no condensation...

Page 10: ...tion Resistance 1000MΩ DC500V Contact Resistance 0 5 mΩ Max Withstand Voltage 2000V Sheathing Fire Protection Rating UL94 V 0 Insertion Force 80N 2 8 2 Charging Interface Materials and Image Treatment Cover Thermo plastic material Terminal Copper Alloy Silver Plating Inter Core Thermo plastic material 2 8 3 Plug and Socket Image ...

Page 11: ...ugh space for installation as well for ventilation The surrounding humidity is between 5 95 without condensation The clean environment Avoid closing to combustible and explosive materials 3 2 Installation Size At present the pole stand and wall mounted are available for Charging Station Please install and fix the device according the shown size G 3 1 and G 3 2 are for the pole stand installation a...

Page 12: ...BESEN INTERNATIONAL GROUP CO LTD BESEN GROUP COM leading the EV Charging to a better way Page 11 G3 2 Plate Holes Size for Pole stand Installation G3 3 Wall mounted Installation ...

Page 13: ...BESEN INTERNATIONAL GROUP CO LTD BESEN GROUP COM leading the EV Charging to a better way Page 12 Wire hanging Frame Wall mounted Plate ...

Page 14: ...ten it 3 3 2 Wall mounted Charging Station 1 Select a place vertical to the ground like wall or support frame 2 Dig the holes in the place according to wall mounted frame fixing holes size 6 Φ7 and wire hanging frame fixing holes size 4 Φ5 5 in G3 4 Keep them in the same vertical line 3 Fix the wall mounted frame on the installation place by bolts or concrete nails 4 Match the wall mounted plate a...

Page 15: ...evice bottom into the device and then connect to a 5P white docking terminal After well connect all cables fasten the waterproof gland to prevent dust and water from entering to lead to a short circuit Please refer to G 3 5 and G 3 5 in the following for the wiring Wall mounted Charging Station Installation When wiring get through the waterproof gland in the bottom directly Open the fixed fence in...

Page 16: ... CO LTD BESEN GROUP COM leading the EV Charging to a better way Page 15 G3 5 Singe phase and Pole stand Model G3 6 Three phase and Pole stand Model G3 7 Singe phase and Wall mounted Model G3 8 Three phase and Wall mounted Model ...

Page 17: ...ight status Power light is flashing green power supply of device is normal Charging light is continuous green device is standby Charging light is flashing green device is working Fault light is red device has fault 4 2 Operation Steps 1 Before start please check whether the installation and wiring is correct After confirmed connect the charging station to power supply 2 Check the indicated lights ...

Page 18: ...fferent vehicle If charging station with keys please turn on 5 When need to end the charging unplug the charging cable from vehicle and hang back the cable to hook If charging station with key please turn off Note In emergency user can press the Emergency Button in the right side of device to sop charging ...

Page 19: ...operation Please check the parts including the wire the cooper bar the terminals and the jumper cap whether they are firm and the contact is good or not After checking please connect to power supply to test Please aspirating and cleaning the air regular according the atmosphere air including the indicator shield charging cable and charging cable fixed seat when cleaning please cut off all the powe...

Page 20: ...ence as well the trade mark in the invoice is clear and visible Otherwise Besen is not responsible for the quality assurance A Any device with trouble shooting during the warranty period Besen will repair it or change new one B Please return the unqualified product to Besen after renewal C Please reserve the reasonable period for repair Under circumstance the Besen has the right not to carry out t...

Reviews: