Put the key which you have removed
from the side in the key cylinder and
check to make sure it locks correctly.
Now insert the door into the summer
house. Open the door and adjust it
from the inside if necessary.
Make
sure that the door leaf does not
swing open by itself.
Screw the door
tight with the components and take
care that it is installed accurately.
Now check to make sure the elements
are properly placed on the
fl
oor. If ne-
cessary, adjust them by pressing the
components until they
fi
t. Screw the
components to the
fl
oor with the pro-
per tension and check again to make
sure you have screwed the wall com-
ponents together properly.
Place the two prefabricated gable ele-
ments on top of the summer house.
Use a wooden board to protect the gable
elements against hammer blows. This will
help you attach the gable element
fi
rm-
ly to the wall element. Screw the gable
elements and the wall elements together
properly.
Now place the ridge purlin in the prefabri-
cated slots. Attach the two fascia rails on
the left and right hand-side of the gable.
Make sure that the spacing at the back
and in the front is equal.
Now screw the fascia rails and the ridge
purlin to the respective components with
the proper tension.
S
TEP
4
Door installation
S
TEP
5
Gable elements and ridge purlin
We are not responsible for damages during assembly!
4