background image

Put the key which you have removed 
from the side in the key cylinder and 
check to make sure it locks correctly. 
Now insert the door into the summer 
house. Open the door and adjust it 
from the inside if necessary. 

Make 

sure that the door leaf does not 
swing open by itself.

 Screw the door 

tight with the components and take 
care that it is installed accurately.

Now check to make sure the elements 
are properly placed on the 

fl

 oor. If ne-

cessary, adjust them by pressing the 
components until they 

fi

 t. Screw the 

components to the 

fl

 oor with the pro-

per tension and check again to make 
sure you have screwed the wall com-
ponents together properly. 

Place the two prefabricated gable ele-
ments on top of the summer house.

Use a wooden board to protect the gable 
elements against hammer blows. This will 
help you attach the gable element 

fi

 rm-

ly to the wall element. Screw the gable 
elements and the wall elements together 
properly.

Now place the ridge purlin in the prefabri-
cated slots. Attach the two fascia rails on 
the left and right hand-side of the gable.

Make sure that the spacing at the back 
and in the front is equal.

Now screw the fascia rails and the ridge 
purlin to the respective components with 
the proper tension.

S

TEP

 4

Door installation

S

TEP

 5

Gable elements and ridge purlin

We are not responsible for damages during assembly!

4

Summary of Contents for MH2 2121 S

Page 1: ...he assembly it is recommended to have a third person assist with larger summer houses Prefabricated buildings Model Saddle roof ASSEMBLY INSTRUCTIONS Recommended tools Cordless screwdriver Pliers Spir...

Page 2: ...RTANT Please have a close look at the dra wing prior to assembly because this is the only way to visualise where the individual components need to be placed during assembly The package always contains...

Page 3: ...g Screw the wall components at least 4 times per side on top at the bottom and twice in the middle with the appropriate spacing The pieces must be screwed together flush without gaps It is recommended...

Page 4: ...gain to make sure you have screwed the wall com ponents together properly Place the two prefabricated gable ele ments on top of the summer house Use a wooden board to protect the gable elements agains...

Page 5: ...a screwdriver to screw in the uppermost screw Be careful not to overtighten it if you work with a cordless screwdriver You can screw in the bottom screw after opening the window since the window handl...

Page 6: ...the spacing to the wall is consistent The backmost board needs to be cut to size in most cases Afterwards mount the remaining boards on the other side as described above Now mount the gable boards at...

Page 7: ...e sheets so that the next layers always overlap the underlying sheet at the upper edge by approx 20 30 cm Always lay the sheets from bottom to top the final sheet at the ridge top of the roof should b...

Page 8: ...th the assembly of your summer house please ask your specialist supplier for help He will gladly assist you Bertsch Holzbau rejects any warranty for damages resulting from incorrect assem bly or gross...

Reviews: