Bertan 602C Installation And Operating Manual Download Page 7

7

2.6 

TRIP UNIT

See Section 2.7 for hook-up information.  Provides the user with a means of remote turn

ON/OFF.  This input requires a contact closure to ground to turn off the high voltage.  An NPN
open collector transistor logic can also be employed.  When no connection is made to this

input the high voltage is enabled.

2.7 

INPUT/CONTROL/MONITOR CONNECTIONS

INPUT POWER CONNECTIONS

INPUT POWER CONNECTIONS

SERIES 602C/603C/612C ONLY

  

SERIES 605C/606C ONLY

CONTROL AND 

PIN LAYOUT

MONITORING CONNECTIONS

INPUT/CONTROL/MONITOR

ALL MODELS

CONNECTOR (P2)

Note:

To obtain local control using the internal potentiometer accessible at the top of the unit, jumper
P2 pin 4 to pin 9.

For remote potentiometer control connect the remote potentiometer as follows:

CW terminal to P2 pin 5

CCW terminal to P2 pin 3

Wiper terminal to P2 pin 4

For remote 0 to +5V voltage programming apply the input program voltage to P2 pin 4.

For remote TRIP connect P2 pin 8 to P2 pin 3

  TERMINAL

      FUNCTION

115/230Vac Input

Neutral

Ground

P2/PIN#

FUNCTION

Input Power Control

2

+Vcc Input

P2/PIN#

FUNCTION

Ground

Program Input

+5Vdc Reference

kV Monitor

Current Monitor

Trip (Short to Gnd)

Internal Program

0

0

0

7

8

9

0

0

0

4

5

6

0

0

0

1

2

3

Summary of Contents for 602C

Page 1: ...NSTALLATION AND OPERATING MANUAL BERTAN SERIES 602C 603C 605C 606C 612C Del Power Conversion Group One Commerce Park Valhalla NY 10595 Phone 800 811 0638 FAX 914 686 2870 A DEL Global Technologies Company ...

Page 2: ...esistance programming is also available to the user as a standard feature All units offer a 0 to 5Vdc analog monitor output proportional to the output current The Series 602C 603C and 612C require an input of 115 230Vac switch selectable 10 50 60Hz The Series 605C and 606C require a 28Vdc 10 input or 24Vdc 10 for units equipped with 24V Option Each unit in the Series converts the applied power to ...

Page 3: ... change Load Regulation 0 002 maximum for a NL to FL and FL to NL change Temp Coeff 50ppm o C over the range of 0 to 50o C Stability 0 01 hr 0 02 8 hrs after hour warm up Control LOCAL Internal minimum 15 turn potentiometer REMOTE VOLTAGE 0 to 5Vdc analog input signal is proportional to 0 to maximum rated output input impedance approximately 0MÙ REMOTE RESISTANCE A 5kÙ potentiometer for variable c...

Page 4: ...UG 932 U Bertan PDB 603C 606C 15 P N thru 50 P N KINGS 1707 1 SHV 1705 1 Bertan PAE All 605C and all 100 P N and 150 P N 8101FP 8101M Bertan PGC 008L151 000 All 200P N 8101FP 8101M Bertan PGC 008L151 000 All 300P N 8111SFP 8111M Bertan PGQ 008L201 000 Only the mating connectors for the 8101FP and 8111SFP assembled to an unshielded high voltage cable are provided For other HV mating connectors orde...

Page 5: ...bs kg 602C 5 03 x 3 06 x 8 66 125 x 78 x 220 6 75 3 1 603C 5 00 x 5 50 x 8 50 127 x 140 x 216 8 0 3 64 605C 5 04 x 2 75 x 4 75 128 x 70 140 x 114 3 2 1 45 606C 5 00 x 5 50 x 4 50 127 x 140 x 114 3 5 1 6 612C 4 88 x 8 38 x 9 75 124 x 213 x 248 9 4 1 ...

Page 6: ... making appropriate connections via the 9 pin Molex connector All modes provide high voltage control from 0 to 100 0 5 2 3 1 INTERNAL POTENTIOMETER CONTROL See Section 2 7 for hook up information This will allow control of the high voltage output by means of the multi turn potentiometer accessible via a hole in the cover 2 3 2 EXTERNAL POTENTIOIMETER CONTROL See Section 2 7 for hook up information...

Page 7: ...ROL MONITOR ALL MODELS CONNECTOR P2 Note To obtain local control using the internal potentiometer accessible at the top of the unit jumper P2 pin 4 to pin 9 For remote potentiometer control connect the remote potentiometer as follows CW terminal to P2 pin 5 CCW terminal to P2 pin 3 Wiper terminal to P2 pin 4 For remote 0 to 5V voltage programming apply the input program voltage to P2 pin 4 For rem...

Page 8: ...this operation the jumpers on PCB100 must be configured as shown in the chart below In this mode the programming signal is applied to P2 pin 4 same as for Standard Mode only now a 0 to 5 Volt programming input is required to achieve 0 to 100 output voltage programming No jumpers should be attached to P2 the external connector In this mode there is no internal control the internal potentiometer is ...

Page 9: ...voltage programming No jumpers should be attached to P2 the external connector In this mode there is no internal control the internal potentiometer is bypassed TABLE III 1 PCB 100 JUMPER POSITIONS STANDARD MODE Jumper pins 1 to 3 pins 5 to 7 3 3 5 VOLT PROGRAMMING for 0 to 100 output voltage MODE Jumper pins 1 to 2 pins 3 to 4 3 4 5 VOLT PROGRAMMING for 0 to 103 output voltage MODE Jumper pins 1 t...

Page 10: ...e free operation If any question should arise contact the Bertan Customer Service Department for assistance or return authorization Although it is felt that adequate information is provided in this manual it is suggested that the unit be returned to the factory is service should become necessary The power supply can be returned to the factory for annual calibration and certification to its origina...

Reviews: