![Beretta SCF-20N Installation Manual Download Page 7](http://html1.mh-extra.com/html/beretta/scf-20n/scf-20n_installation-manual_2736726007.webp)
7
Unpacking the product
UNPACKING THE PRODUCT
The solar collectors are packed in various ways depending
on the number of units supplied:
A
Packages of 1 or 2 collectors
B
Packages of 7 collectors
Pallet contents:
- collector
- document envelopes containing instruction manuals,
test certificate and bar code label.
b
The instruction manual is an integral part of the solar
connector. Once located, read it thoroughly and keep
it safe.
b
STORE IN A DRY PLACE AND DO NOT EXPOSE TO DI-
RECT SUNLIGHT UNTIL THE TIME OF INSTALLATION!
The packaging is not designed to protect the prod-
uct against rain or humidity. It can also degrade if ex-
posed to direct sunlight. Failure to comply with these
precautions could lead to irreparable damage to the
product.
A
B
Handling
HANDLING
Once you have removed the outer packaging, proceed as
follows to unpack and handle the solar collector:
- Remove the PVC wrapping to free the solar collector
from the pallet.
- Tilt the solar collector slightly and grip it at the four
points shown (A) to lift it.
- Use a hoist or other suitable lifting equipment to hoist
the solar collector on to the roof.
b
Wear suitable personal protective equipment and use
suitable safety devices.
a
Do not dispose of packaging material into the envi-
ronment, or leave it within the reach of children, since
it can become a potential hazard. Dispose of packag-
ing material in compliance with applicable legislation.
a
Do not lift the solar collector by its water fittings.
A
A
A
A
Summary of Contents for SCF-20N
Page 1: ...SOLAR COLLECTOR SCF 20N INSTALLATION MANUAL SOLAR ...
Page 11: ...11 ...