23
5 SHUT-DOWN
If the boiler is not going to be used for an
extended period of time, perform the follow-
ing operations:
- switch the boiler on at the control panel
switch and check that the green power indi-
cator lights (fig. 5.1).
- turn the mains power switch OFF (fig. 5.2)
- close the boiler’s fuel cock and water circuit
cock (fig. 5.3).
b
Empty the boiler if there is any risk of
freezing.
Fig. 5.1
Fig. 5.2
ON
OFF
Fig. 5.3