
47
ENGLISH
2 9 Multi-row wiring diagram for device connection and cascade
management
1
2
3
4
Fig. 9
Note!
- in cascade configuration, it is necessary to remove the U-bolt TA on the boiler's terminal board M6.
- before powering on the devices, make sure that you have properly selected the address switches for the CoCo
communication interfaces according to the scheme