Preparing for installation
18
Preparing for installation
This chapter explains which prerequisites have to
be met for installation. Carry out all of the steps
contained in these instructions in succession.
WARNING
Risk of injury due to falling parts in the
event of improper mounting.
¾
Ensure the carrying capacity of the
cupboard.
¾
Use suitable mounting material only.
The enclosed mounting material is
exclusively suitable for mounting in a
stable cupboard (e.g. 16 mm
wooden plate). In the case of other
installation conditions, contact berbel
Ablufttechnik GmbH and ask about
alternative mounting options prior to
installation.
¾
Make sure that the device is
mounted correctly.
¾
Make sure that the mains voltage corresponds to
the voltage specified on the model plate.
¾
Make sure that connection to the voltage supply is
only carried out following installation.
Personnel qualifications
Two persons are required to mechanically install the
device.
These installation engineers must have adequate
specialist trade knowledge.
Necessary specialist trade knowledge includes:
•
Knowledge of the industrial safety regulations
•
Knowledge of reading technical drawings
•
Experience of using electrical and mechanical
tools
•
Knowledge of mounting technology
•
Basic knowledge of ventilation technology
•
Ideally, several years' experience of installing
extractor hoods and other additional
qualifications, such as e.g. joinery training, are
also available.
Persons without this specialist knowledge must be
familiarised with installation by an experienced
installation engineer.
Required aids
The following tools, materials and underlays are
required for installation:
1
2
4
3
5
Phillips screwdriver
2.5 mm Allen ball key
Thick cardboard to protect e.g. the cooker top
and the work surface
Installation instructions
Jigsaw