8. Replacement of electrical components
1.
Switch off the mains power.
2.
Note the connection of the existing component.
3.
Remove the existing component.
4.
Install the new component using the same wiring as the existing
component or the specified alternative arrangement.
5.
Turn on the mains power.
6.
Check the function of the new component.
7.
Start the burner. Check combustion.*
Note:
*
When servicing/replacing components that affect combustion, an
analysis and soot test shall be carried out on the installation.
!
If the burner is directly connected, ensure that all
components on the burner are without power.