background image

171 505 46  09-01

Two pipe installation

One pipe installation

Oil under

pressure

Oil under 

suction

By-passed 

oil returned 

to tank,or 

to suction

INSTRUCTIONS PUMP TYPE SUNTEC A2L 65C  -  75C

Pump operating principle for 

A2L 65C  -  75C

The 

SUNTEC A2L

 oil pump has two 

nozzle outlets. It incorporates two 

blocking solenoid valves with in-line-

cut-off function, one for each nozzle 

outlet.

The gear set draws oil from the tank 

through the built-in filter and transfers 

it to the nozzle line via the cut-off so-

lenoid valves. A pressure regulating 

valve is used to dump all oil which is 

not required at the nozzle.

In one-pipe operation, the oil which 

does not go through the nozzle lines is 

returned directly to the gear inlet and 

the suction line flow is equal to the 

sum of the 2 nozzle flows. In two-pipe 

operation, the by-pass plug must be 

fitted in the return port, which ensures  

that the oil dumped by the regulating 

valve is returned to the tank and the 

suction line flow is equal to the gear 

set capacity.

Bleed

Bleeding in two-pipe operation is au-

tomatic: it is assured by a bleed flat 

on the piston. In one-pipe operation, 

a high pressure connection must be 

loosened until the air is evacuated 

from the system.

Cut-Off

The solenoid valves of the A2L pump 

are of the "normally closed" type and 

are situated in the nozzle lines. This 

design ensures extremely fast res-

ponse and the switching can be sel-

ected according to the burner opera-

ting sequence and is independant of 

motor speed.

When the solenoids are non-activated, 

the valves are closed and all oil 

pressurised by the gear set passes 

through the regulator to suction or to 

the return line, depending upon pipe 

arrangement.

As soon as the solenoids are activat-

ed, oil passes to the nozzle lines at 

the pressure set by the pressure 

regulating valve.

A2L

 C

XX

Shaft rotation and nozzle

location seen from shaft end 

Gear set capacity

A2L: 2 nozzle outlets

Exchange of filter

Mounting/dismounting return plug

One pipe system

Two pipe system

Solenoid valve 2 (NC) closed

Solenoid valve 2 

(NC) open

Solenoid valve 1 

(NC) open

To nozzle 2

To nozzle 1

Pressure 

gauge port

Pressure 

gauge port

Shaft seal

By-pass 

plug

Return

Suction

By-pass plug

removed

Solenoid valve 1 (NC) closed

Gear set

Vacuum gauge port

 Pressure adjustment

Return 

plugged

Back to suction

Summary of Contents for B 45 A2.2H

Page 1: ...Providing sustainable energy solutions worldwide 178 014 56 2014 11 11 Installation and maintenance instruction B 45 A2 2H...

Page 2: ......

Page 3: ...e 2 15 Solenoid valves 16 Nozzle assembly adjustment 17 Connecting pipe pump adjustment device 18 Adjustment device Nozzle assembly adjustment 19 Fuse 20 Indicating lamp Stage 2 21 Switch I II 22 Indi...

Page 4: ...and the spray pattern change with the pump pressure Output range and nozzles recommended The net calorific value of 11 86 kWh kg for light oil has been used Length of burner tube Flange Measure B B45A...

Page 5: ...TECHNICAL DATA 171 225 34 09 01 Dimensions of flange 14 134 200 224 260...

Page 6: ...optimum adjust ment is obtained If larger nozzles are used the preadjustment of both the air volume and the nozzle assembly must be increased A whistling sound may be heard which can be eliminated or...

Page 7: ...stage Set the operating switch S2 on low capacity I Loosen the screw A and turn the damper to the position wan ted Tighten the screw A again Second stage Set the operating switch S2 on high capacity...

Page 8: ...and cut off the oil supply Service of burner head alt A Service of burner head alt B Note For maintenance of the brake plate nozzles electrodes etc when using a long design of the burner tube you have...

Page 9: ...l burner control LMO24 255 Wiring diagram ELECTRIC EQUIPMENT 1 3 1N 50 60 Hz 230 V If the boiler is not equipped with wired contacts connect the enclosed contacts to terminals X4 and X6 in accordance...

Page 10: ...es and the solenoid valve 1 opens 2 2 Solenoid valve 1 opens Oil mist is formed and ignited The photocell indicates a flame 3 The safety time expires a If no flame is established before this time limi...

Page 11: ...blem by pressing and holding the reset button for 3 seconds The number of flashes below is repeated with a pause in between 2 flashes No flame signal when safety time expires 4 flashes False light dur...

Page 12: ...length in metres at a nozzle capacity of 9 5 Gph Max permissible pres sure at the suction and pressure side is 2 0 bar Components 1 Nozzle outlet G 1 8 Stage 2 2 Pressure gauge port G 1 8 3 Nozzle ou...

Page 13: ...ic it is assured by a bleed flat on the piston In one pipe operation a high pressure connection must be loosened until the air is evacuated from the system Cut Off The solenoid valves of the A2L pump...

Page 14: ...93 9 71 115 99 10 24 121 104 10 73 127 109 3 00 9 98 118 102 10 59 126 108 11 16 132 114 11 71 139 119 3 50 11 65 138 119 12 35 146 126 13 03 154 133 13 66 162 139 4 00 13 31 158 136 14 12 167 144 14...

Page 15: ...1 21 133 114 11 67 138 119 12 11 144 123 12 53 148 128 3 00 12 23 145 125 12 73 151 130 13 21 157 135 13 67 162 139 3 50 14 27 169 145 14 85 176 151 15 42 183 157 15 95 189 163 4 00 16 31 193 166 16 9...

Page 16: ...23 34 277 238 6 00 22 34 265 228 23 42 278 239 24 47 290 250 24 46 302 260 6 50 24 20 287 247 25 37 301 259 26 51 314 270 27 58 327 281 7 00 26 06 309 266 27 33 324 279 28 55 339 291 29 70 352 303 7 5...

Page 17: ...70 317 272 6 00 26 43 313 270 27 49 326 280 28 27 335 288 29 13 345 297 6 50 28 63 340 292 29 63 351 302 30 62 363 312 31 55 374 322 7 00 30 84 366 314 31 91 378 325 32 98 391 336 33 98 403 374 7 50 3...

Page 18: ...9 256 220 4 50 22 47 266 229 23 09 274 235 23 69 281 242 24 28 288 248 5 00 24 97 296 255 25 65 304 262 26 33 312 268 26 98 320 275 5 50 27 47 326 280 28 22 335 288 28 96 343 295 29 68 352 303 6 00 29...

Page 19: ...3 56 279 240 4 50 24 85 295 253 25 41 301 259 25 96 308 265 26 49 314 270 5 00 27 61 327 282 28 24 335 288 28 84 342 294 29 44 349 300 5 50 30 38 360 310 31 06 368 317 31 73 376 324 32 38 384 330 6 00...

Page 20: ...magnetic valve Burner fails to start Lamp not lit Motor runs Burner runs to lockout Fuse has blown Appliance thermostat has not reset Appliance overheat device has operated Control relay or photocell...

Page 21: ...nt conformes aux normes et aux documents normatifs suivants et satisfont aux crit res applicables des directives CE suivantes Dokument EN 267 EN 60335 EU direktiv EU Directives EU Direktiven CE suivan...

Page 22: ...the burner will not start Press the reset button on the relay Check that the thermostats are correctly adjusted Don t forget the room thermostat check that any fusesare intact and main switch is on If...

Page 23: ......

Page 24: ...Enertech AB P O Box 309 SE 341 26 Ljungby www bentone se www bentone com...

Reviews: