BENSON HEATING LTD RS/UHA2 105 Technical Information, Assembling Instructions, Use And Maintenance Download Page 4

 

Heaters type 1-2-3-4-5 

 
 
 

C

FAN 1

C

  FAN 2

IMT

J6

NL

F2

F1

N

J5

II°

SF

230

V

 5

0

H

z

EF

SE

J4

J8

IGN1

PA

COM

COM

NA

NC

ION

EA1

J1

1

J1

7

J2

J1

4

VM

TA

J1

6

J1

3

J7

RSTR

MS

EVG1

-I

°

EVG

1-I

RST

LB

LL

LF

J1

0

J9

J12

SND

LM

TR

J1

5

J1

8

J1

 

 
 

KEY: 

 

SND

 Temperature 

probe 

 

TR

 

Regulatory control thermostat (auto reset)  

LM

 

LIMIT thermostat (manual reset) 

EVG1-I°

  Gas solenoid valve1 

EVG1-II° 

Second stage  gas valve 2 

C

 Fan 

capacitor 

FAN 1

 

Axial fan 1 

FAN 2

 

Axial fan 2 (type 5) 

F1-F2

 

Line fuse (6,3 A) 

LF

 Green 

working 

light 

LL

 

High temperature indication light 

LB

 Lockout 

indication 

RST

 Lockout 

reset 

EF

 Flue 

venter 

PA

 

Differential pressure switch 

IGN1

 Ignition 

transformer 

EA1

 Spark 

electrode 

ION

 Ionisation 

probe 

SE

 

Electrical control board 

IMT (*)

 Fused 

isolator 

MS (*)

 

Fire damper connection (accessory) 

RSTR (*) 

Remote reset connection 

TA (*)

 

Room thermostat connection 

VM (*)

 

Fan switch connection 

SF (*)

 

Second stage gas valve connection 

 

(*)

 External to the heater customer supply. 

 

 
 

Summary of Contents for RS/UHA2 105

Page 1: ...ed unit heaters 2 stage TECHNICAL INFORMATION ASSEMBLY INSTRUCTIONS USE AND MAINTENANCE RS UHA 2 BENSON HEATING LUDLOW ROAD KNIGHTON POWYS LD7 1LP MAY 2003 Benson Heating is a divison of Benson Climat...

Page 2: ...uctions for the safe installation use and maintenance of the appliance s Where proprietary items are incorporated into Benson Heating products detailed information and instructions are also provided a...

Page 3: ...R THE USER Operation Servicing Heater indication lights Receipt of product Transport Dimension FOR THE INSTALLER Location Wall bracket dimensions Gas connection Flue and combustion options Electrical...

Page 4: ...cond stage gas valve 2 C Fan capacitor FAN 1 Axial fan 1 FAN 2 Axial fan 2 type 5 F1 F2 Line fuse 6 3 A LF Green working light LL High temperature indication light LB Lockout indication RST Lockout re...

Page 5: ...II Second stage gas valve 2 C Fan capacitor FAN 1 Axial fan 1 FAN 2 Axial fan 2 FAN 3 Axial fan 3 Type 7 F1 F2 Line fuse LF Green working light LL High temperature indication light LB Lockout indicat...

Page 6: ...indicating gas type 6 Ensure settings are correct as per the manual and data plate CHANGE INJECTORS To change injectors Unscrew the natural gas injectors and replace them with the correct size inject...

Page 7: ...en the gas isolating cock switch on the electrical supply set the room thermostat to the desired temperature The heater is now ready for operation GAS VALVE Model SIT 843 two stage The heater must onl...

Page 8: ...ponents are correct for the installation including storage tank pipes and pressure valves etc Ensure that the pressure regulators are sealed after carrying out the conversion GAS PRESSURE REGULATION T...

Page 9: ...orrect pressure according to the data plate is achieved Gas valve head pressure setting low fire Propane G31 When setting the gas pressure for propane low fire first stage contact SF should be open Th...

Page 10: ...orking Check flue pipe and combustion air pipe are clear Faulty differential pressure switch Replace differential pressure switch Poor connection at pressure switch Check air pipe to switch is connect...

Page 11: ...bar Faulty burner tube Replace the burner tube Faulty ignition transformer Replace ignition transformer Faulty ignition Check the gas type is suitable for the heater Check the inlet gas pressure Check...

Page 12: ...correct and the air flow over the chamber is sufficient Faulty SND thermostat or control panel Replace SND thermostat or control panel Burner goes out due to the intervention of the TR thermostat and...

Page 13: ...and the air flow over the chamber is sufficient Faulty thermostat Replace thermostat Faulty fan Check fan capacitor Check fan motor Intervention of thermal overload on fan Check electrical absorption...

Page 14: ...heater Check the gas pressure Check burner head pressure The fan does not work Defective fan control Change fan control or SND thermostat Faulty fan Check fan capacitor Check the fan motor The heater...

Page 15: ...B22 Single flue option with condensate tee and roof terminal combustion air from inside the room Type 1 2 3 4...

Page 16: ...1000 with seal T Terminal with guard 100 U Condensate Tee with drain point V Pipe M M 100 L 200 without seal NOTE IMPORTANT MODEL 1 2 3 4 FLUE SPIGOT 100 female COMBUSTION AIR SPIGOT 100 female INSTA...

Page 17: ...165 ITEM DESCRIPTION A Pipe M F 100 L 1000 with seal T Terminal with guard 100 U Condensate tee with drain point Z Pipe M F 100 L 250 with seal NOTE IMPORTANT MODEL 5 6 7 FLUE SPIGOT SIZE 100 male COM...

Page 18: ...RIPTION A Flue pipe M F 100 L 1000 with seal H Bend 90 M F 100 with seal L Vertical co axial roof terminal kit 100 100 U Condensate tee with drain point V pipe M M 100 L 200 without seal NOTE IMPORTAN...

Page 19: ...with seal N Vertical co axial roof terminal kit 100 150 P Adaptor F F 150 L 200 with seal Q Bend 45 M F 150 with seal R Pipe M F 150 L 140 with seal S Bend 90 F F 100 with seal U Condensate tee with d...

Reviews: