4

 

 
Devices listed and identified for grounding frames of PV modules are permitted to ground the 
exposed metallic frames of the module to grounded mounting structures. Per NEC 250.136, 
electrical  equipment  secured  to  and  in  electrical  contact  with  a  metal  rack  or  structure 
provided  for  its  support  and  grounded  by  one  of  the  means  indicated  in  250.134  shall  be 
considered effectively grounded. 
 
 

Mounting 

Modules  may  be  mounted  at  any  angle  from  horizontal  to  vertical.  Select  the  appropriate 
orientation to maximize sunlight exposure.   
 
The gap between the module and system structure or ground is required to prevent wiring 
damage and allows air to circulate behind the module. 
 
Make  sure  that  the  module  installation  shall  obey  local  fire-resistant  regulations.  Do  not 
remove or alter the module frame. Additional mounting holes may damage the module and 
reduce the strength of the frame. 
 
 

Important 

Modules should be mounted using the following methods only:    
1.

1.

1.

1.

 

Screwing

Screwing

Screwing

Screwing: 

: : 

:      

Secure  the  module  to  the  structure  using  the  factory  mounting  holes.  The  torque 
wrench must be used for assembly. In the examples shown, the tightening torque must 
be 20N

m. Use the existing holes for securing the module; do not drill any additional 

holes (doing so would void the warranty). Use corrosion-proof fastening materials.   

 

For PM220P00 and PM240P00 modules, four stainless steel bolts, with nuts, washers, 
and  lock  washers  are  recommended  per  module.  Only  the  existing  mounting  holes 
(Diameter: 9mm) that can be used for module to meet 5400Pa design strength under 
IEC 61215/IEC 61730 and to meet 2400Pa design strength under UL 1703. 

 

2.

2.

2.

2.

 

Clamping

Clamping

Clamping

Clamping:   

Note that

Note that

Note that

Note that the 

 the 

 the 

 the clamping 

clamping 

clamping 

clamping clips on the

clips on the

clips on the

clips on the side

 side

 side

 side frame

 frame

 frame

 frame should be in parallel

 should be in parallel

 should be in parallel

 should be in parallel

. Here are 2 clamping 

methods. 

 

Clamping on longer side frame: The side frames are attached to the longer sides of 
the module. Figure 3 shows effective mounting area. 
The centerline of the clips should be between D1-375mm~D2-460mm from the 
short end of the module for 5400 Pa design strength under IEC 61215/IEC 61730 
and for 2400Pa design strength under UL 1703. 
 

 

Clamping  on  shorter  side  frame:  The  side  frames  are  attached  to  the  shorter 
sides of the module. Figure 4 shows effective mounting area. 
The centerline of the clips should be between D3-50mm~D4-150mm from the 
long end of the module for 2400 Pa design strength under IEC 61215/IEC 61730.     
Installers  should  ensure  the  clamps  are  of  sufficient  strength  to  allow  for  the 
maximum design pressure of the module. Clips and clamps are not provided by 

Summary of Contents for PM220P00

Page 1: ...B Be en nQ Q S So ol la ar r P Ph ho ot to ov vo ol lt ta ai ic c M Mo od du ul le es s I IE EC C E ET TL L PM220P00 PM240P00 Installation Guide for Users...

Page 2: ...ncluding but not limited to installation application or removal by any party other than a qualified personnel non observance of BenQ Solar s installation users and or maintenance instructions repair o...

Page 3: ...modules Damaged modules broken glass torn back sheet broken j boxes broken connectors etc can be electrical hazards as well as laceration hazards Contact with damaged module surfaces or module frame c...

Page 4: ...iation the temperature of the cells and the equipment to which they are connected a PV module will generate a different current and voltage levels which result in a different power output Grounding Be...

Page 5: ...uld void the warranty Use corrosion proof fastening materials For PM220P00 and PM240P00 modules four stainless steel bolts with nuts washers and lock washers are recommended per module Only the existi...

Page 6: ...Last revised December 2011 5 BenQ Solar Figure 2 Installation of module Figure 3 Effective mounting area clamping...

Page 7: ...ge or adjustment on the cable of Junction Box D D D DO O O O NOT NOT NOT NOT disconnect cable by yourself Important The cable must not be bent or crushed on the direct exit of the cable screw joint A...

Page 8: ...the southern hemisphere The module must be installed so that air can freely circulate around it The cells working temperature will thus be reduced and consequently the module s performance will be en...

Page 9: ...the PV conductor which cross section is 4 mm2 External connection boxes will be used to enable greater cable cross section area for long distance transmission The modules are qualified for the applic...

Page 10: ...g Inspection of connections and cabling Perform preventive maintenance every 6 months carrying out the following operations Check the tightness and condition of the connection cable junctions Check th...

Reviews: