background image

Operating manual

Z-TESTER

Before  you  use  the  meter  startup  tester  

Z-TESTER: Please read the operating manual 

and follow the safety instructions therein!

Index of contents:

1.    Safety instructions

2.    Mode of operation of meter startup tester

3.    Operating check of low voltage meters

4.    Technical data

5.    Cleaning the meter startup tester

6.  Environmental notice

1.    Safety instructions

The  following  international  electrical  symbols 

appear on the unit:

 

Attention! Follow the instructions!

   Conductive double or reinforced insulation 

(Protection class II)

-   This unit has been built and tested according 

to VDE specifications and has left the factory 

in  a  technically  safe  condition.  To  maintain 

this  condition  and  to  ensure  safe  operation 

the  user  must  follow  all  instructions  and 

warnings contained in this operating manual.

-    The  unit  is  intended  for  uses  according  to 

IEC 664 Category II. It is suitable for using in 

circuits up to 230 V.

-    During  testing  hold  the  unit  by  insulated 

handles   and   only, do not touch the test 

electrodes 

!

-   Use the unit in dry conditions only!

-    Please  note,  any  work  carried  out  on  con-

ductive parts and instruments are inherently 

dangerous.  Voltages  from  30  V  AC  and 

60 V DC can be life-threatening to a person.

-    Always check for faults before each use.

-    Absolutely avoid getting the unit damp or wet.

-    Avoid  any  dew  on  the  unit  (condensation). 

This occurs when the unit is transferred from 

a  cold  environment  into  a  warm  one.  This 

reduces the strength of insulation inside the 

unit and could lead to insulation faults. If this 

arises store the unit at a high temperature in 

an appropriate place for approx. 1 hour.

-    Always  observe  the  maximum  permissable 

switch-on period!

-    If you suspect that safe operation is no longer 

possible, then the unit must be switched  off 

immediately and secured against any future 

unintentional use.

-    Safety during use of the unit can no longer 

be guaranteed if:

 

-  the unit presents visible damage

 

-   the unit no longer functions

 

-   after  prolonged  storage  in  unfavorable 

conditions

  

-   after severe transport stresses

2.    Mode of operation of meter startup tester

The meter startup tester Z-TESTER is a handheld 

twin-pole tester.

It  consists  of  a  housing  handle    and  probe 

handle   with test electrodes 

.

The following display features and switches are 

found on the housing handle (see representative 

drawing):

-   signal lamp (red LED) for voltage display of 

230 V 

.

-   signal lamp (red LED) for voltage display of 

400 V (overload) 

.

-    signal  lamp  (green  LED)  for  meter  startup 

test 

.

-    Turn-on switch which doubles as a selection 

switch between 50 W and 100 W for meter 

startup  test 

  with  the  OFF-position  of  the 

switch in the centre.

The meter startup tester Z-TESTER is designed 

for  short  periods  of  operation.  An  internal  fan 

ensures  the  cooling  of  resistors  under  load. 

This fan is activated during the load test (meter 

startup  test)  only.  If  an  overload  or  overheating 

of the unit occurs, a built-in temperature sensor 

automatically switches the unit off. A green LED 

signal lamp lights up when the meter startup test 

is operating 

. Automatic switch-off by the tem-

perature sensor also turns this LED off and stops 

the fan.

3.     Operating  check  of  the  low  voltage 

meters

The meter startup tester Z-TESTER is designed 

to  check  the  correct  operation  of  low  voltage 

meters.

After the calibrated low voltage meter has been 

installed,  the  following  parameters  must  be 

checked on site:

-   startup  ability  for  a  load  of  50  W  or  100  W 

(depending on meter type)

-   check if the current input and output connec-

tions  are  correct  and  not  reversed  by  mis-

take.

-   phase voltage test

The meter startup tester Z-TESTER features all 

relevant  properties  for  checking  that  the  above 

requirements are fulfilled.

For  operation  checks  on  meters  the  following 

loads apply:

Mains AC meters: 

 

50 W

3-phase mains meters 10/ 60: 

50 W

3-phase mians meters 20/ 100: 

100 W

A few seconds only are sufficient for each phase 

when  testing  a  meter‘s  startup  ability.  The  test 

should be as short as possible.

-   place  the  test  electrodes 

  of  the  test 

handles   and   against the relevant points 

of meter under test. For the 3-phase mains 

meter  test  each  phase  against  an  earthed 

neutral.

-   Turn  unit  on  with  selection  switch 

  and 

watch tester display for startup movements!

4.    Technical data

-  Protection class: II

-   Protection type: IP 20

 

 IP 20  means:  Protection  against  access 

to  dangerous  parts  and  protection  against 

solid impurities of a diameter > 12.5 mm, (2 

- first index). No protection against water, (0 

- second index).

-   Nominal voltage: 230 V AC

-   Overload category: II

-   Overload  capacity:  up  to  400  V  AC  with 

delayed automatic switch-off

-   Nominal cooling capacity: 50 W and 100 W

-   Current input: 

 

 Load test: approx. 0,27/ 0,47 A at 230 V AC

 

 Measuring circuit: approx. 0,012 A at 230 V AC

-   Internal resistance:

 

Load circuit: approx. 490 

 

Measuring circuit: approx. 20 k

-   Frequency range: 50 Hz - 60 Hz

-   Switch-on period: max. 30 seconds

-   Total cycle time (operating time + cooling time): 

15 minutes

-   Environmental  conditions:  altitudes  up  to 

2000 m above sea level

-   Temperature range: 

 

0 °C to 40 °C (working temperature range)

 

- 20 °C to 65 °C (storage temperature range)

-   max. relative humidity: 

 

80 % up to 31 °C in linear regression

 

 50 % up to 40 °C 

-   tested and certified according to: 

 

DIN EN 61010-1 (VDE 0511 T1)

 

EN 61010-01

 

DIN EN 61010-1/ A2 (VDE 0411 T1/A1)

 

EN 61010-1/ A2: GSG § 3

5.    Cleaning the meter startup tester

Use a mild detergent with a moist cloth to clean 

the unit.

6.  Environmental notice

At  the  end  of  the  product’s  useful  life, 

please  dispose  of  it  at  appropriate 

collection  points  provided  in  your 

country.

 

Bedienungsanleitung

 

Operating manual

Z

-T

E

S

T

E

R

geprüft und zugelassen

BENNING Elektrotechnik & Elektronik GmbH & Co.KG

Münsterstraße 135 - 137 • D - 46397 Bocholt

T+49 (0) 2871 - 93 - 0 • Fax ++49 (0) 2871 - 93 - 429

www.benning.de • E-Mail: [email protected]

T.-Nr

. 785926.01/ 1

1-2005 

Reviews: