GrandPrix Two-Post Lifts
25
P/N 5900209 — Rev. D3 — Feb. 2020
The following drawing is a top view of the components of the Top Trough. Not every component is
shown, just the components relevant to installing the Lift. The Offside Post is on the left, the Powerside
Post is on the right.
Preparing the Top Trough
The Top Trough goes between the two posts at the top of the Lift.
To prepare the Top Trough, you need to:
•
Route the Lifting cables.
•
Route the safety cables.
•
Connect the hydraulic cables (but not the hydraulic lines).
Tip
We strongly recommend raising the Top Trough off the ground when performing these
preparation tasks; a saw horse works great for this, for example.
Routing the Lifting Cables
The Lifting cables move the Lift Heads and Lift Arms up and down.
To route the Lifting cables
:
1.
Make sure you have two Long Cables and two Short Cables.
All cables have ID tags showing their lengths.
2.
Extend the Cylinder Rod until the Pullblock sheave pin lines up with the Access Hole in the Top
Trough.
This can be done by carefully pulling the Cylinder Rod by hand or carefully using an air gun
(remove both plugs, insert air gun in port furthest from the Cylinder Rod, push air in).
⚠
CAUTION
Be careful not to damage the Cylinder Rod when extending it. Do not exceed 50
PSI if using an air gun. If Cylinder Rod is not extending, stop and use a cable puller
or other pulling device. Keep hands clear of pinch points.
Summary of Contents for GP-7
Page 7: ...GrandPrix Two Post Lifts 7 P N 5900209 Rev D3 Feb 2020 Specifications ...
Page 14: ...GrandPrix Two Post Lifts 14 P N 5900209 Rev D3 Feb 2020 Clearances ...
Page 64: ...GrandPrix Two Post Lifts 64 P N 5900209 Rev D3 Feb 2020 Wiring and Hydraulic Schematic ...
Page 65: ...GrandPrix Two Post Lifts 65 P N 5900209 Rev D3 Feb 2020 Parts Diagrams ...
Page 66: ...GrandPrix Two Post Lifts 66 P N 5900209 Rev D3 Feb 2020 ...
Page 67: ...GrandPrix Two Post Lifts 67 P N 5900209 Rev D3 Feb 2020 ...
Page 68: ...GrandPrix Two Post Lifts 68 P N 5900209 Rev D3 Feb 2020 ...
Page 69: ...GrandPrix Two Post Lifts 69 P N 5900209 Rev D3 Feb 2020 ...
Page 70: ...GrandPrix Two Post Lifts 70 P N 5900209 Rev D3 Feb 2020 ...
Page 71: ...GrandPrix Two Post Lifts 71 P N 5900209 Rev D3 Feb 2020 ...
Page 72: ...GrandPrix Two Post Lifts 72 P N 5900209 Rev D3 Feb 2020 ...
Page 73: ...GrandPrix Two Post Lifts 73 P N 5900209 Rev D3 Feb 2020 ...
Page 74: ...GrandPrix Two Post Lifts 74 P N 5900209 Rev D3 Feb 2020 ...
Page 75: ...GrandPrix Two Post Lifts 75 P N 5900209 Rev D3 Feb 2020 ...
Page 76: ...GrandPrix Two Post Lifts 76 P N 5900209 Rev D3 Feb 2020 ...
Page 77: ...GrandPrix Two Post Lifts 77 P N 5900209 Rev D3 Feb 2020 ...
Page 78: ...GrandPrix Two Post Lifts 78 P N 5900209 Rev D3 Feb 2020 Labels ...
Page 79: ...GrandPrix Two Post Lifts 79 P N 5900209 Rev D3 Feb 2020 ...
Page 80: ...GrandPrix Two Post Lifts 80 P N 5900209 Rev D3 Feb 2020 ...
Page 81: ...GrandPrix Two Post Lifts 81 P N 5900209 Rev D3 Feb 2020 ...
Page 82: ...GrandPrix Two Post Lifts 82 P N 5900209 Rev D3 Feb 2020 Maintenance Log ...
Page 83: ...GrandPrix Two Post Lifts 83 P N 5900209 Rev D3 Feb 2020 Maintenance Log ...