background image

22

Summary of Contents for POTTERTON Gold

Page 1: ...the requirements of the CE marking directive and is Kiwa approved to show compliance with Building Regulations Section G3 The following instructions are offered as a guide to installation which must b...

Page 2: ...TION SOLAR PRIMARY 9 INSTALLATION AUXILLARY HEATING COIL 10 COMMISSIONING 12 MAINTENANCE 13 USER INSTRUCTIONS 14 FAULT FINDING AND SERVICING 15 HEAT LOSS 19 ENVIRONMENTAL INFORMATION 19 COMMISSIONING...

Page 3: ...OLD SOLAR cylinder has an operating pressure of 3 5 bar which is controlled by the cold water combinationvalveassembly Thecoldwatercombination valve assembly can be connected to a maximum mains pressu...

Page 4: ...OLAR PRIMARY IS ACHIEVED BY THE USE OF EXTERNAL CONTROLS NOT SUPPLIED WITHTHE UNIT CONTROL MUST BEVIA A PURPOSE DESIGNED SOLAR HYDRAULIC STATION AND SOLAR DIFFERENTIAL TEMPERATURE CONTROLLER IMPORTANT...

Page 5: ...DIMENSIONS E P Y T A B C D SURFACE AREA m2 RATING kW RECOVERY mins AUXILLARY VOLUME litres AUXILLARY COIL TIME DIRECT mins DIRECT HEATING 1 1 120 0 61 11 9 22 1 1 140 803 923 732 1372 1473 1009 925 10...

Page 6: ...arge should be visible at the tundish In addition where discharges from safety devices may not be apparent e g in dwellings occupied by people with impaired vision or mobility consideration should be...

Page 7: ...2 15mm 22mm 28mm 35mm up to 9m up to 18m up to 27m 0 8m 1 0m 1 4m G3 4 22mm 28mm 35mm 42mm up to 9m up to 18m up to 27m 1 0m 1 4m 1 7m G1 28mm 35mm 42mm 54mm up to 9m up to 18m up to 27m 1 4m 1 7m 2 3...

Page 8: ...IRED AUX PRIMARY RETURN AUX PRIMARY FLOW BOOST ELEMENT AUX CONTROL HOUSING Fig 5 Typical discharge pipe arrangement extract from Building Regulation G3 Guidance section Fixed grating Discharge below f...

Page 9: ...ntroller Programmer The cylinder temperature sensing probe supplied with the solar controller should be fully inserted into the pocket provided on the POTTERTON GOLD Solar cylinder and its cable secur...

Page 10: ...primary heating source The POTTERTON GOLD Solar cylinder MUST be earthed All wiring to the unit must be installed in accordance with the latest IEEWiring Regulations and the supply circuits must be pr...

Page 11: ...11 11 Fig 9 Schematic wiring diagram Basic 2 x 2 port valve system Fig 10 Schematic wiring diagram 3 port mid position valve system N B Must be used in conjunction with 2 port zone valve supplied...

Page 12: ...mary circuit The solar controller should be programmed to give a maximum storage temperature in the POTTERTON GOLD Solar cylinder of 70o C 60o C is recommended to minimise scaling COMMISSIONING SECOND...

Page 13: ...ert a round bladed screwdriver into one of the pockets on the immersion heater and gently lever up and down INDIRECT MODELS Open the cover s to the immersion heater housing s and disconnect wiring fro...

Page 14: ...ontroller This will usually have been set during commissioning to give a storage temperature of approximately 60o C Refer to user instructions supplied with the controller for details of how to adjust...

Page 15: ...TANT After servicing complete the relevant ServiceIntervalRecordsectionoftheBenchmark Checklist located on page 20 and 21 of this document Servicing should only be carried out by competent persons in...

Page 16: ...Ex pa nsio n v a lv e co mple te 6ba r 95 6 0 7 0 30 C o ld w a te r combina tio n v a lv e comple te 95 6 0 5 0 47 C o ld w a te r combina tio n v a lv e body 95 6 0 5 0 48 Pre ssure re ducing v a l...

Page 17: ...17 17 15 3 19 2 16 13 12 13 16 2 1 3 17 15 11 Fig 12 Spares Diagram...

Page 18: ...ot working 4 Check boiler operation If fault is suspected consult boiler manufacturer s instructions 5 INDIRECT thermal cut out has operated 5 Check Reset by pushing button on cut out Check operation...

Page 19: ...al benefits Insulation is by means of an approved CFC HCFC free polyurethane foam with an ozone depletion factor of zero While the following Checklist can be used for any installation covered by its d...

Page 20: ...20...

Page 21: ...21 21...

Page 22: ...22...

Page 23: ...23 23...

Page 24: ...allation The Benchmark Checklist has been completed upon commissioning and the Benchmark Service Record is completed for each service It has not been modified in any way other than by POTTERTON GOLD I...

Reviews: