background image

Seite 2 von 3

07/2021

BEMO SYSTEMS GmbH

Max-Eyth-Straße 2
74532 Ilshofen-Eckartshausen

T:   +49 7904 29899-60
E:   [email protected]
W:   www.bemo.com

2. Seaming (pressing) the profiles

3. Seamed profile

Step 3

The Top-seaming machine is placed on the AKKORD profile with the lever open. Close the lever by pushing it back to the machine. The 
closing of the lever can be simplified by tapping the on switch. Check that the press rollers are properly positioned on the profile.
Switching on the machine starts the folding process. As a rule, the speed should be selected between level 3 and 4 and care should 
be taken to ensure that the cable feed is unobstructed.
While the machine is running independently, the operator should walk alongside the machine. Should the machine reach the end of 
the Akkord profile, it should be switched off and removed from the Akkord profile after opening the lever.

2.  Opening of the lever

1.  Attaching of the AKKORD-

seaming machine

3. Closing of the lever 

Reviews: