![Belshaw Brothers TZ17 Operator'S Manual And Technical Supplement Download Page 4](http://html1.mh-extra.com/html/belshaw-brothers/tz17/tz17_operators-manual-and-technical-supplement_2730399004.webp)
Belshaw Bros., Inc.
•
www.belshaw.com
•
Phone 206-322-5474
•
Fax 206-322-5425
Thermolizer TZ6 & TZ17 OM
MN-1257EN
1
1 Operation
Control Functions
A.
HUMIDITY CONTROL
: This control
is located inside the control box front
panel and can only be adjusted by a
qualified technician. It controls the
water heating element. Set on high, the
water heat element will remain on
constantly. Set on any setting other than
high, the control will cycle on and off.
Higher numbered settings create a longer
on-cycle and high humidity. The factory
setting is 4.5 on the dial.
B.
HEAT CONTROL
: This control is
located inside the control box front panel
and can only be adjusted by a qualified
technician. It controls the air-heating
element. The factory setting is: place the
dot on the knob at 11:00 to produce 95 -
110F.
C.
CONTROL BOX POWER SWITCH
:
Controls the power to the control box.
CAUTION
Do not permit water pan to run out of
water. Check often. Use only soft or
distilled water in the operation of this
proofer.
Operation Instructions
CAUTION
If water is spilled while filling the water
pan, thoroughly dry all surfaces including
the floor. Spilled water may cause serious
injury, loss of life, or damage to
equipment. Water may continue to drip.
To prevent the floor from becoming wet
and slippery, use a pan to collect dripping
water. Do not move the proofer when
water is in the reservoir.
Note: Use only distilled or purified water in
the Thermolizer to avoid build-up in the
water box of minerals and deposits normally
found in tap water.
1.
Lift off water reservoir cover and fill water
reservoir (see Figure 3). If necessary, open
the lower door(s) and remove screen(s) or
tray(s) to access the water reservoir. Do not
fill beyond ½” of the top edge. When
finished, replace the cover and doors. If
equipped with the autofill unit, turn on the
water and the filler unit will stop at the
correct water level.
Note: Do not pull the control box out to gain
access to the water reservoir because water
may be spilled when moving the control box.
2.
Turn on control box power switch.
3.
Wait 25 minutes for the Thermolizer to
reach operating temperature.