1 Installation
Unpacking and Assembling
the Thermolizer
Use a forklift to transport the shipping crate to
the workstation.
1.
Break down the shipping crate.
2.
Remove the packing materials from the
thermolizer, including foam, tape, brown
paper, plastic, and white protective coating.
Do not remove the plastic from the
Plexiglas doors at this time.
3.
Cut the bands holding the control box in
place and remove the control box from the
cabinet.
4.
Remove and discard the plywood that the
control box was resting on.
5.
Inspect the machine to see that no parts are
bent, scratched, or otherwise damaged. If
any damage has occurred in shipping, file a
freight claim with the shipping company
immediately.
6.
Clean the humidifier water box and attach to
filtered water per plumbing codes in your
area. Refer to Section 3 for cleaning
instructions.
7.
Install screen rack angles onto angle
supports by tilting the angles up and sliding
the flange into the notches of the supports.
See Figure 1.
WARNING
If water is spilled while cleaning the
thermolizer, be sure to dry the floor
thoroughly.
Figure 1
8.
If not already done, remove the packing
material from the control box and the put
water reservoir cover in place over the water
reservoir.
9.
Place the control box into the cabinet, push
the cord through the hole in the bottom to
the right of the control panel, and close the
cord opening cover plate.
10.
Remove the protective covering from the
Plexiglas doors. Clean the doors with warm
water.
11.
Insert the hinge pin on the right side of the
door into place, and then slip the left side
hinge pin into the slot.