24
Connect to the gas supply
The inlet to the cooker is
1
⁄
2
” BSP
internal situated at the rear right corner.
Fit the bayonet connection. This should
be located so as to ensure that the
flexible connector hose does not kink.
Use a 900mm - 1125mm length of
flexible connector.
Ensure that all pipe work is of the correct
rating for both size and temperature.
Flexible connections should comply
with BS 669. Parts of the appliance
likely to come into contact with a
flexible connector have a temperature
rise of less than 70˚C.
After installation, make sure all
connections are gas sound.
Commissioning
Burner aeration
All burners have fixed aeration and no
adjustment is possible.
Pressure setting
G20 Natural Gas @ 20 mbar
Pressure test point
Use the oven injector.
Grill -
Open the top compartment
door before igniting the grill. Push in
the control knob and turn clockwise to
the grill setting., wait a second before
pressing the ignition switch or holding
a lighted match or taper to the burner.
Hob -
Turn the control knob to the
FULL
ON
position, wait a second before
pressing the ignition switch or holding
a lighted match or taper to the burner.
Ovens -
Open the oven door. Turn
the control to the
F U L L O N
position and
p r e s s the ignition switch,or holding a
lighted match or taper to the burner. The
b u r n e r operates at a low rate for up to
60 seconds until the flame supervision
device opens & full gas rate is obtained.
Before leaving the installation
1. Place all the loose parts of the
cooker into position.
2. Show the customer how to operate
the cooker and give them this
handbook. Thank you.
INSTALLATION INSTRUCTIONS
25388 02 Format G754 Belling 1/7/05 9:03 AM Page 26
Summary of Contents for G754
Page 28: ...NOTES...
Page 29: ......
Page 30: ......
Page 32: ...08 25388 02 7 2005 d Stoney Lane Prescot Merseyside L35 2XW...