Technical He44 (0)1924 893380
www.
belllighting
.co.uk
British Electric Lamps Ltd
Unit A Foxbridge Way, Normanton Industrial Estate
Normanton, West Yorkshire. WF6 1TN
T
: +44 (0)1924 893380
F
: +44 (0)1924 894320
E
www.
belllighting
.co.uk
Testing / Commissioning (self test)
Functionality of the test switch.
1) A short press (>1s) on the button start a function test lasting 5 seconds (The
battery’s capacity should be more than 5% = charging 30 mins
2) Holding down the button(>10s) resets the timer(System-resets)
Functional test
The 5 second long, each 7 days’ function test serves to check the functionality of
the emergency unit, the batteries and LED Module.
Notice.
If a mains supply failure occurs whilst a functional test is in progress, the test
shall be postponed and the system shall enter emergency operation. Following
restoration of the mains supply, a postponed functional test shall re-commence
automatically as soon as conditions permit.
Duration test (EN)
Initial duration test: The test will be carried out exactly 24 hours after the initial
installation.
Half year duration test: The test will be carried out on each 180-182 days.
Notice.
A duration test shall only be started when the battery supply is fully charged if a
mains supply failure occurs whilst a duration test is in progress, the test shall be
postponed and the system shall enter emergency operation. Following restoration
of the mains supply, a postponed duration test shall re-commence automatically
when the battery supply is fully re-charged.
The indicator will be slow flashing Green within 5 days if the duration test be
carried out successfully.
Indicator LED
System status is locally by a bi-color indicator LED.
Notice Fault Status
If an error is detected, the indicator LED
switches to RED. If the error has been corrected please
re-connecting the battery after the mains power is switched
off, the indicator LED immediately switches back to GREEN
when mains power is switched on.
Notice
Battery failed during test: After an exchange of the battery
and holding down the button (>10S) reset the timer, the
indicator LED switches to GREEN.
- 02 -
EFFORT SEMICONDUCTOR LIGHTING LTD
.
Functionality of the test switch
Functional test
1) A short press (>1s) on the button start a function test lasting 5 seconds (The battery’s capacity should be more than
2)Holding down the button(>10s) resets the timer(System-resets)
The 5 second long, each 7 days’ function test serves to check the functionality of the emergency unit, the batteries and
Duration test (EN)
-Initial duration test: The test will be carried out exactly 24 hours later after the initial installation.
-Half year duration test: The test will be carried out on each 180-182days.
Testing/Commissioning(self test)
LED module.
5%=charging 30mins
Indicator LED
System status is locally by a bi-color indicator LED.
LED Indication
Commentary
Status
Standby,System OK
Permanent green
Mains Operation, battery is charged
Fast flashing green
(0.25s on–0.25s off)
Function test
underway
Function test underway
Slow flashing green
(1 s on – 1 s off)
Duration test
underway
Duration test underway
Permanent Red
Lamp failure
Open Circuit or Short Circuit or LED failure
Fast flashing red
(0.25 s on – 0.25 s off)
Battery capacity
failure
Battery failed duration test
Slow flashing red
(1 s on – 1 s off)
Battery fault
Green and red off
Battery Operation
Emergency mode: Mains disconnected
Incorrect battery voltage or Short Circuit
or Open Circuit
or Mains failure
Notice.
-A duration test shall only be started when the battery supply is fully charge if a mains supply failure occurs whilst a
duration test is in progress, the test shall be postponed and the system shall enter emergency operation. Following
restoration of the mains supply, a postponed duration test shall re-commence automatically when the battery supply
is fully re-charge
-The indicator will be slow flashing Green within 5 days if the duration test be carried out successfully.
Notice.
-If a mains supply failure occurs whilst a functional test is in progress, the test shall be postponed and the system shall
enter emergency operation. Following restoration of the mains supply, a postponed functional test shall re-commence
automatically as soon as conditions permit.
If an error is detected, the indicator LED
switches to RED. If the error has been
corrected please re-connecting the battery
after the mains power off, the indicator LED
immediately switches back to GREEN when
After an exchange of the battery and holding
down the button (>10S) reset the timer, the
indicator LED switches to GREEN.
Fault status:
Battery failed duration test:
mains power on.
NOTICE
NOTICE
Installation Instructions: Deco Grande (06810/11/12/13)
Date
Revision
1.6.2022
2
06810-11_12_13 Deco Grande Installation Ins.indd 3
06810-11_12_13 Deco Grande Installation Ins.indd 3
23/06/2022 09:22
23/06/2022 09:22