En
7
1.
Set the DIP switches. If you have only one OmniView
™
PRO, use the MASTER
bank setting. If the OmniView
™
PRO you are using will be daisy-chained off
another unit, use a unique slave setting. Please refer to the previous section
for more information.
DIP SWITCH #
3
4
5
6
ON
ON
ON
ON
BANK 0
MASTER
OFF
ON
ON
ON
BANK 1
slave
ON
OFF
ON
ON
BANK 2
slave
OFF
OFF
ON
ON
BANK 3
slave
ON
ON
OFF
ON
BANK 4
slave
OFF
ON
OFF
ON
BANK 5
slave
ON
OFF
OFF
ON
BANK 6
slave
OFF
OFF
OFF
ON
BANK 7
slave
ON
ON
ON
OFF
BANK 8
slave
OFF
ON
ON
OFF
BANK 9
slave
ON
OFF
ON
OFF
BANK A
slave
OFF
OFF
ON
OFF
BANK B
slave
ON
ON
OFF
OFF
BANK C
slave
OFF
ON
OFF
OFF
BANK D
slave
ON
OFF
OFF
OFF
BANK E
slave
OFF
OFF
OFF
OFF
BANK F
slave
NOTE:
“ON” is down
2.
Find a convenient place to put your OmniView
™
PRO. Its 19" form factor makes it
ideal for 19" racks. When mounting to a rack, attach the included brackets to the
sides of the OmniView
™
PRO. Take note of the length of your cables so that your
computers, OmniView
™
PRO, keyboard, mouse, and monitor are distanced properly.
PLEASE FOLLOW THIS INSTALLATION PROCEDURE EXACTLY. NOT DOING SO MAY
RESULT IN KEYBOARD AND/OR MOUSE ERRORS, OR FAULTY OPERATION.
WARNING:
Before attempting to connect anything to the OmniView
™
PRO or the computers, make sure everything is powered off. Plugging and
unplugging cables may cause irreversible damage to your computers and
the OmniView
™
PRO. Belkin Components will not be held responsible for
damage caused.
Hardware Installation
BANK ADDRESS
F1D116_OSD_AM_man.qxd 4/20/00 4:07 PM Page 7
All manuals and user guides at all-guides.com