V3.3 07.2016•
Subject to modifi
cation
UL marked actuators is optional, please contact your local Sales Representative for details.
12
2
Pushbutton and green LED display
Off
:
Illuminated:
Press button
:
No voltage supply or malfunction
Operation
Switches on angle of rotation adaption followed by standard operation
3
Pushbutton and yellow LED display
Off:
Illuminated:
Blinking:
Press button:
Flickering:
Standard operation without MP-Bus
Adaption or synchronising process active
Addressing request sent to MP master
Acknowledgment of addressing
MP communication active
4
Gear disengagement switch
Press button:
Release button:
Gear disengaged, motor stops, manual operation possible
Gear engaged, synchronisation starts, followed by standard operation
5
Service plug
For connecting parameterising and service tools
Check voltage supply connection
2
Off and
3
illuminated: Check the supply connections.
Possibly
and
+
~
are swapped over.
3
2
4
Adaption
Address
Power
Status
5
Recommended installation positions
The ball valve can be installed upright to horizontal. The ball valve may not be installed in a
hanging position, i.e. with the stem pointing downwards.
Installation position in return
Installation in the return is recommended.
Water quality requirements
The water quality requirements specified in VDI 2035 must be adhered to.
Ball valves are regulating devices. The use of dirt filters is recommended in order to prolong
their service life for performing control tasks.
Maintenance
Ball valves, rotary actuators and sensors are maintenance-free.
Before any kind of service work is carried out on the actuator, it is essential to isolate the
rotary actuator from the power supply (by disconnecting the electrical cable). Any pumps
in the part of the piping system concerned must also be switched off and the appropriate
slide valves closed (allow everything to cool down first if necessary and reduce the system
pressure to ambient pressure level).
The system must not be returned to service until the ball valve and the rotary actuator have
been properly reassembled in accordance with the instructions and the pipelines have been
refilled in the proper manner.
Flow direction
The direction of flow, specified by an arrow on the housing, is to be complied with, since
otherwise the flow rate will be measured incorrectly.
Earthing
Above DN65, it is imperative that the measuring pipe be correctly earthed in order to ensure that
the volumetric flow sensor does not make any unnecessary incorrect measurements.
90°
90°
EP..R+MP / P6..W..E-MP
Operating controls and indicators
Installation notes