background image

 

 

INSTALLATION 

 
 

CAUTION:  

Make sure your installation complies with the local 
authorities and with the appropriate NFPA Standards, 
which are available from the National Fire Prevention 
Association. 

 

FOUNDATION AND SPACE REQUIREMENTS 
 

The  foundation  must  be  level  and  adequate  to  support  the  assembled 
collector's  operating  weight  plus  any  auxiliary  equipment.  Units  must  be 
anchored  properly  to  the  ground  with  the  use  of  the  legs  bolt  down  pads. 
Adequate space must be allowed to connect inlet and outlet duct work and to 
service  all  components  easily.  Refer  to  drawing  0886-BIA-00000  of 
appendix 2. 

 
LIFTING 
 

Lift dust collector only by the underneath the unit.  Never lift by the fan shaft 
or fan housing outlet. 
 

UNIT ASSEMBLY 
 

Refer to drawing 0886-BIA-00000 of appendix 2. 
 

FAN MODULE

 

 
Turn fan wheel by hand to verify that it rotates freely. Shortly start motor and 
verify the direction of the rotation. If fan wheel is running in wrong direction, 
have an electrician switch two (2) wires of the motor connections. 
 

ELECTRICAL

  

 
Protect  the  fan  motor  with  time  delay  fuses  having  a  capacity  ranging 
between  125%  and  150%  of  nominal  amperage  indicated  on  motor  name 
plate. 
 

DUCTING 

 
Connect  fan  intake  to  pick  up  points  using  rigid  ducting  and  keep  length  of 
flexible ducting, when necessary, to a minimum. 

Summary of Contents for NBM

Page 1: ...Instruction And Maintenance Manual For Dust Collector Manuel D Instructions Et De Maintenance Pour Dépoussiéreur Model NBM OP Modèle Serial Number Numéro De Série ...

Page 2: ......

Page 3: ...D SPARE PARTS LIST APPENDIX 1 DRAWINGS APPENDIX 2 OPTION PNEUMATIC DUST TRANSFER SYSTEM APPENDIX 3 AVERTISSEMENT 13 MISE EN GARDE 14 DESCRIPTION 15 INSTALLATION 16 MISE EN MARCHE INITIALE 19 INSTRUCTIONS D OPÉRATION 20 ENTRETIEN GÉNÉRAL 23 PROBLÈMES OCCASIONNELS 24 GARANTIE 25 LISTE DE PIÈCES DE RECHANGE RECOMMENDÉES ANNEXE 1 DESSINS ANNEXE 2 OPTION SYSTÈME DE TRANSFERT PNEUMTIQUE ANNEXE 3 ...

Page 4: ...bec These regulations include the RSST Règlement sur la santé et la sécurité du travail Below is an excerpt from article 59 1 regarding open dust collectors installed inside in the woodworking industry Please review the RSST for the complete information www csst qc ca Open dust collectors are located at least 20 ft away from any means of egress or area routinely occupied by personnel or other dust...

Page 5: ...DEFECTIVE COMPONENT OR AN OPERATOR WRONG SETTING THE PRESENCE OF SAFETY COMPONENTS ON YOUR EQUIPMENT CANNOT IN ITSELF ASSURE ABSOLUTE SAFETY OF OPERATION FOR A SAFE OPERATION THERE IS NO SUBSTITUTE FOR A DILIGENT CAPABLE WELL TRAINED OPERATOR IT IS THE SOLE RESPONSIBILITY OF THE USER TO ESTABLISH SCHEDULE AND ENFORCE THE FREQUENCY OF AND THE EXTENT OF THE INSPECTION MAINTENANCE PROGRAM BECAUSE ONL...

Page 6: ...s When the blower is stopped and the manual shaker mechanism shakes the filter bags the waste material falls to the storage section where it is removed by either emptying 45 gallons drums or the optional dumping bins If the optional pneumatic dust transfer system including modular hoppers and blowers is connected to the dust collector the dust will be continuously transferred from the bottom of th...

Page 7: ... easily Refer to drawing 0886 BIA 00000 of appendix 2 LIFTING Lift dust collector only by the underneath the unit Never lift by the fan shaft or fan housing outlet UNIT ASSEMBLY Refer to drawing 0886 BIA 00000 of appendix 2 FAN MODULE Turn fan wheel by hand to verify that it rotates freely Shortly start motor and verify the direction of the rotation If fan wheel is running in wrong direction have ...

Page 8: ...his step 4 Once the end bolts are secured back up the dumping bin to gain access to the second set of holes located in the middle of the coupling plate 5 With four 4 bolts installed remove slowly the dumping bin to gain access to the last two 2 holes 6 Now make sure that the six 6 bolts are tighten properly and seal to the filtration unit achieved Then simply glide the dumping bin through the quic...

Page 9: ...e six 6 bolts are tighten properly and seal to the filtration unit achieved 5 Installed each additional modular hopper the same way 6 Install the two closing plates at each end of the modular hoppers Install the two blowers of the transfer system and the transfer piping as per drawing 0482 BVD 00000 of appendix 3 Minimize as much as possible the use of 90 degrees elbows and flexible ducting in the...

Page 10: ...f ducting on fan inlet motor overload may trip Should this occur you must restrict the air flow on the air inlet opening by installing a blast gate complete with locking device This is usually a temporary measure until filters build up a dust cake and create the required resistance WARNING Fan wheel is designed for light material loading sanding dust sawdust etc Severe damage may be caused to the ...

Page 11: ...tor has been switched off If filter bags are plugged due to over filling of storage section clean out manually DO NOT USE THE SHAKER FILTER BAGS The filter bags are hung on the bag shaker frame by their grommets and attached to the hole sheet below by their snap ring cuffs bi bender IT IS IMPORTANT THAT THE GROOVE ON THE SNAP RING CUFF IS PROPERLY ENGAGED IN THE SHEET HOLE The bag shaker frame is ...

Page 12: ...mp make sure the tip of the forks will not hit the upper shoulder when the bin will be tilted total exceeding fork length may not be longer than the vertical part of the shoulder Keep the forks tilted backward and elevate the bin as required When positioned and ready to dump tilt the forks forward You may have to give the bin a boost with an extending object from underneath close to the swivel cas...

Page 13: ...t Unbolt and remove the motor from the motor support plate For installation reverse the above INSPECTION TO TAKE PLACE AFTER THE FIRST WEEK OF OPERATION Check the dust collector for filter bags failure and abrasion During the first week of operation check the storage section for waste level and determine the emptying frequency that will be required SEMI ANNUAL INSPECTION Lubricate all electric mot...

Page 14: ...gs are dirty Clean or replace filter bags Dampers or gates are closed Open dampers or gates Duct work is leaking or blocked Repair or unblock ducts Worn Impeller Replace Impeller The storage bin is full and the filter bags are blocked Empty storage and manually clean filter bags before restarting unit DO NOT USE THE SHAKER 3 Unit is unduly noisy or has excessive vibration Broken or damaged fan bla...

Page 15: ... To protect yourself you must let us know as soon as a problem arises thereby avoiding possible further damage Many parts in this equipment are normally replaced with use Because these parts may be easily damaged or consumed in normal operation these parts such as straps filter bags filter cartridges etc are not covered by this warranty Nor does this warranty apply to equipment or components manuf...

Page 16: ...lter le RSST pour l information complete www csst qc ca Le dépoussiéreur n est pas relié à une ponceuse ou une raboteuse par abrasion à alimentation mécanique La capacité ne dépasse pas 2 4 mètres cube par seconde 5000 PCM Le dépoussiéreur est installé à au moins 6 mètres d un poste de travail d une voie de circulation ou d une sortie de secours à moins qu un écran de protection contre la déflagra...

Page 17: ...LLANCE D UNE COMPOSANTE OU D UN MAUVAIS RÉGLAGE DE L OPÉRATEUR LA PRÉSENCE SUR L ÉQUIPEMENT DE COMPOSANTES DE SÉCURITÉ N EST PAS UNE GARANTIE ABSOLUE D UN FONCTIONNEMENT SÛR POUR UN FONCTIONNEMENT SÉCURITAIRE RIEN NE REMPLACE UN OPÉRATEUR BIEN ENTRAÎNÉ ET ATTENTIONNÉ PUISQUE SEUL L OPÉRATEUR CONNAÎT LES CONDITIONS RÉELLES D UTILISATION DE L ÉQUIPEMENT IL EST DE VOTRE RESPONSABILITÉ D ÉTABLIR UN PR...

Page 18: ...es sont retenues dans les sacs de filtration Lorsque le ventilateur s arrête et que l on secoue les sacs de filtration les rebuts tombent soi dans les barils de rétention dans les chariots dompeurs option ou dans le système de transfert pneumatique option Si le système optionnel de transfert de poussière pneumatique incluant les trémies modulaires et les ventilateurs est branché sur les modules de...

Page 19: ...n Se référer au dessin 0948 DAB 00000 de l annexe 2 LEVAGE Levez le dépoussiéreur par le dessous Ne jamais lever l appareil par l arbre du ventilateur ou la sortie du ventilateur ASSEMBLAGE DE L UNITÉ Se référer au dessin 0886 BIB 00000 de l annexe 2 VENTILATEUR Tourner manuellement la roue du ventilateur afin de s assurer qu elle tourne librement Alimenter le moteur un bref instant et vérifier le...

Page 20: ...s à cette étape 4 Lorsque les boulons à l arrière sont posés reculer le chariot dompeur afin d atteindre les trous situés au centre de la plaque d accouplement rapide 5 Lorsque les quatre 4 boulons sont installés sortir complètement le chariot dompeur Les deux 2 derniers boulons sont maintenant accessibles et peuvent être installés 6 Serrer adéquatement les six 6 boulons et vérifier l étanchéité e...

Page 21: ...déquatement les six 6 boulons et vérifier l étanchéité entre la plaque d accouplement rapide et l unité de filtration 5 Installer chaque trémie additionnelle de la même façon 6 Installer les deux plaques de bouts des trémies Installer les deux ventilateurs du système de transfert et le réseau de tuyauterie tel que le dessin 0482 BVC 00000 de l annexe 3 Minimiser autant que possible l utilisation d...

Page 22: ... à l entrée le protecteur de surcharge peut interrompre le moteur Dans un tel cas il suffit d installer un volet guillotine avec barrure afin de diminuer le débit d air à l entrée Habituellement il s agit d une mesure temporaire jusqu à ce qu une couche de poussière se soit formée sur les filtres pour ainsi offrir la résistance requise AVERTISSEMENT La roue du ventilateur est conçue pour des charg...

Page 23: ...les boulons soient bien fixés Pour nettoyer les sacs de filtration l opération de secouage sera optimale si elle est effectuée pendant que les sacs de filtration sont encore partiellement gonflés juste avant et quelques temps après le dégonflement total Les sacs de filtration se trouvent dans cet état de dégonflement partiel pendant que la roue du ventilateur tourne encore après que le moteur du v...

Page 24: ...ure du secoueur est suspendue par quatre 4 cornières Pour installer les sacs de filtration débuter par quatre 4 sacs de filtration espacés également à l extérieur du périmètre et vérifier la hauteur de la structure du secoueur pour vous assurer que la tension est appropriée LA TENSION DU SAC DOIT ÊTRE VÉRIFIÉE EN PLAÇANT LE SAC ENTRE DEUX 2 DOIGTS ET EN FAISANT UNE ROTATION DES DOIGTS DE 90o Si la...

Page 25: ...plus le sol Pour vider s assurer que le bout des fourches ne frappera pas l épaulement supérieur lorsque le chariot dompeur basculera l excédent des fourches ne doit pas dépasser la longueur de la partie verticale de l épaulement Tout en gardant les fourches penchées vers l arrière lever le chariot à la hauteur nécessaire Pencher ensuite les fourches vers l avant Au besoin pousser le chariot dompe...

Page 26: ...upport Pour l installation renverser la procédure INSPECTION À FAIRE À LA FIN DE LA PREMIÈRE SEMAINE DE FONCTIONNEMENT Vérifier le dépoussiéreur pour détecter toute défectuosité des sacs de filtration ou toute usure causée par l abrasion Pendant la première semaine de fonctionnement vérifier la section de rétention des rebuts pour déterminer la fréquence de vidange INSPECTION SEMI ANNUELLE Lubrifi...

Page 27: ...sière sont fermés si applicable Ouvrir Il y a des fuites ou des obstructions dans les conduits Réparer et débloquer Roue du ventilateur usée Remplacer Les sacs de filtration sont obstrués à cause d une surcharge dans la section d emmagasinage Vider la section d emmagasinage et nettoyer les sacs manuellement NE PAS UTILISER LE SECOUEUR 3 L appareil est trop bruyant ou a une vibration anormale Une a...

Page 28: ...s pièces doivent être remplacées périodiquement à cause de l usure normale résultant de l utilisation de nos équipements ex courroies sacs filtrants cartouches filtrantes etc Ces pièces ne sont pas couvertes par la présente garantie Cette garantie ne s applique pas à l équipement ou les pièces manufacturées par d autres compagnies ex moteurs électriques démarreurs etc Ces items portent la garantie...

Page 29: ...APPENDIX ANNEXE 1 RECOMMENDED SPARE PARTS LIST LISTE DE PIÈCES DE RECHANGE RECOMMENDÉES ...

Page 30: ......

Page 31: ...ESCRIPTION PART PIÈCES SPECS QTY QTÉ Filter bag 55AVSHA06000GBPWT000 18 Sac de filtration Ventilator wheel See HP Voir HP 1 Roue de ventilateur Sleeve 55AVTPG01500PPPEFGG0 2 Manchon Option Seal for dumping bins 71AACCBZZ00000000000 13 pieds Joint d étanchéité pour chariot ...

Page 32: ......

Page 33: ...APPENDIX ANNEXE 2 DRAWINGS DESSINS ...

Page 34: ......

Page 35: ...APPENDIX ANNEXE 3 OPTION PNEUMATIC DUST TRANSFER SYSTEM OPTION SYSTÈME DE TRANSFERT PNEUMATIQUE ...

Reviews: