Installation SPIDER-SL PoE
18
Release 01 05/2019
2
Installation
The devices have been developed for practical application in a harsh
industrial environment.
On delivery, the device is ready for operation.
To configure a subdomain, follow these steps:
Checking the package contents
Mounting the device
Installing an SFP transceiver (optional)
Wiring the terminal block for the supply voltage and the grounding
Operating the device
Connecting data cables
2.1
Checking the package contents
Check whether the package includes all items named in the section
Check the individual parts for transport damage.
Summary of Contents for Hirschmann SPIDER Standard Line Series
Page 34: ......