CLEARPOINT V
®
Series Activated Carbon Tower
(Rev. D)
6
2.
INSPECTION AND INSTALLATION
2.1
Incoming Inspection and Transportation
All adsorbers are tested and inspected at the factory prior to shipping. Thoroughly inspect and verify the integrity
of the packaging upon receipt and note any damage on the freight bill. Place the unit as close as possible to the
installation point before unpacking the contents and inspect for concealed damage. Freight claims are to be filed with
the carrier immediately and the manufacturer’s technical service department notified thereafter.
+
To move the packaged unit, we suggest the use of a suitable crane or forklift. We do not recommend moving
the unit by any hand operated or manual mechanism.
+
Handle with care. Heavy blows could cause irreparable damage.
+
Even when packaged, keep the machine protected from severe weather.
The packaging materials are recyclable. Each material must be properly disposed in a manner complying
with the rules and regulations of the local municipality government.
3.
TECHNICAL SPECIFICATIONS AND GENERAL FUNCTION
3.1
Technical Data by Model Size
CLEARPOINT V
Model Size 80 100 120 160 200 250 300 400 500 650 800
Flow Rate
scfm
80 100 120 160 200 250 300 400 500 650 800
Inlet / Outlet Connection
in. (NPT) 3/4
1
1
1 ¼ 1 ¼ 1 ½ 1 ½
2
2
2 ½ 2 ½
Height (A)
in. 58
70
70
70
70
77
77
68
78
74
72
Width (B)
in. 11
11
11 14 14 16 16 17 19 22 24
Depth (C)
in. 16
17
17 19 19 23 23 24 26 29 31
Adsorbent Material
Activated Carbon
⅛”
Total per Adsorber
Lbs. 41
51
51
77
77 127 127 149 225 271 338
Maximum Inlet Relative Humidity
%
30
Maximum Inlet Oil Aerosol Content
mg/m
3
0.01
Minimum Ambient Temperature
°F
40
Maximum Ambient Temperature
°F
120
Standard Inlet Air Temperature
°F
100
Maximum Inlet Air Temperature
°F
120
Standard Air Pressure
psig
100
Maximum Air Pressure
psig
150